Project TRXRDN040505 May 5, 2004 Q-band test dewar in Equipment Room for testing with spectrometer. Using heated load on LNA input. Setup ACS with two samplers; sampler 1 only valid. IF into OR1. Scans 1-4 60second to check setup. 1 : SCAN STARTING AT 53130 17:57:49 4 : SCAN FINISHED AT 53130 18:02:28 Changed T->361 s. 5 : SCAN STARTING AT 53130 18:03:55 6 : SCAN FINISHED AT 53130 18:16:11 TLNA=20.3; Tload=19.2K Turned load heater on at 18:17. 7 : SCAN STARTING AT 53130 18:21:10 8 : SCAN FINISHED AT 53130 18:33:26 Interruption. Load heater off. Changed T -> 121sec. TLNA=19.9; Tload=18.8 9 : SCAN STARTING AT 53130 18:52:29 10 : SCAN FINISHED AT 53130 18:56:44 Turned load heater on. Voltage = 15V. TLNA=22.9, Tload=33.3. 11 : SCAN STARTING AT 53130 19:00:18 12 : SCAN FINISHED AT 53130 19:04:33 Changed Vheater=10V; Allowed temp to stabilize to TLNA=22.3, Tload=26.8. 13 : SCAN STARTING AT 53130 19:07:36 14 : SCAN FINISHED AT 53130 19:11:51 Changed Vheater=5V; Allowed temp to stabilize Tlna=20.8, Tload=21.4 15 : SCAN STARTING AT 53130 19:15:46 16 : SCAN FINISHED AT 53130 19:20:01 Heater Off. Allowed temp to stabilize Tlna=20.2, Tload=19.1 17 : SCAN STARTING AT 53130 19:29:17 18 : SCAN FINISHED AT 53130 19:33:32 During all previous tests this day, LNA Id1=2.4mA. Changed to 1.2mA and repeating tests. Condition: Load htr off. 19 : SCAN STARTING AT 53130 19:37:05 22 : SCAN FINISHED AT 53130 19:45:46 Vheater -> 15V. Allowed temps to stabilize. Tlna=24.0, Tload=33.9. 23 : SCAN STARTING AT 53130 19:50:11 24 : SCAN FINISHED AT 53130 19:54:26 Vheater -> 10V. Tlna=22.2, Tload=26.7. 25 : SCAN STARTING AT 53130 19:59:14 26 : SCAN FINISHED AT 53130 20:03:29 Vheater -> 5V. Tlna=21.0, Tload=21.8 27 : SCAN STARTING AT 53130 20:06:43 28 : SCAN FINISHED AT 53130 20:10:58 Heater off. Tlna=20.4, Tload=19.4 29 : SCAN STARTING AT 53130 20:13:16 Thru scan 32.