Date 6/2/2003 Project: TRXRDN030602 X-band receiver in Equipment Room for baseline investigation. Initial scans 2-11 with IF Rack noise source for system health check. Used ~rnorrod/Gbt/TestCfgs/if_acs_odd.cfg to setup. 2 : SCAN STARTING AT 52792 18:56:00 11 : SCAN FINISHED AT 52792 19:08:04 Now, connected X-band rx IF L into OR 1 and R into OR3. Connection map is now: ACSBank & Sampler & SF & CM & OR \\ \hline 1 & 0 & 1 & 1 & 1 & XL \\ 1 & 1 & 5 & 5 & 3 & XR \\ 2 & 2 & 2 & 2 & 2 & NS \\ 2 & 3 & 6 & 6 & 4 & NS \\ 3 & 4 & 3 & 11 & 5 & NS \\ 3 & 5 & 7 & 12 & 7 & NS \\ 4 & 6 & 4 & 15 & 5 & NS \\ 4 & 7 & 8 & 16 & 7 & NS \\ LO1 = 11.4GHz (Fsky=8.4GHz) Receiver is not yet cold; T15 = ~115, T50=~70 12 : SCAN STARTING AT 52792 19:30:18 Found Cal not firing in L channel due to MCB setup error. Corrected during scan 28. 39 : SCAN FINISHED AT 52792 20:04:17 Changed scan time to 300s. T15K = 106K; T50K = 48K 40 : SCAN STARTING AT 52792 20:05:47 41 : SCAN FINISHED AT 52792 20:16:07 Changed LO1=12.0GHz (Fsky=9.0GHz) 42 : SCAN STARTING AT 52792 20:17:47 43 : SCAN FINISHED AT 52792 20:28:07 Changed LO1=12.6GHz (Fsky=9.6GHz) 44 : SCAN STARTING AT 52792 20:30:24 45 : SCAN FINISHED AT 52792 20:40:44 Changed LO1=12.0GHz (Fsky=9.0GHz) Also disabled Tcal. 46 : SCAN STARTING AT 52792 20:48:11 47 : SCAN FINISHED AT 52792 20:58:31 Turned Tcal ON all the time 48 : SCAN STARTING AT 52792 21:00:58 49 : SCAN FINISHED AT 52792 21:11:18 Turned High Tcal ON all the time. 50 : SCAN STARTING AT 52792 21:13:30 51 : SCAN FINISHED AT 52792 21:23:50 Quit for the evening.