MEMORANDUM
In attendance: Fisher, Lacasse, Weadon
Minutes of Previous Meeting
1. Some year-end purchases (Rick)
8. Switching transient noise on GBT
9. Transmissions from the 140-ft for the SOHO mission
10. Progress on suppressing
RFI from equipment that has
been measured in the anechoic chamber
11. Emissions from the new diesels on site
12. GBT RFI 'harmful levels'
document and measurement
procedures
(Rick)
13. Measurement of OVLBI
transmission field strengths at
the GBT.
14. Disabled persons transport on site for tours
15. RFI survey plan for GBT commissioning (Rick)
16. Lab RFI suppression efforts (Rick)
17. Interference at 1612.17 MHz
18. FCC Class B requirements
and test procedures (Rick, Chuck)
Requirement for a turret for anechoic chamber