Interference Protection Group meeting 4/18/00 Proposed Agenda Minutes of 3/21/00 meeting Interference reports Review of action items: 1. Microwave oven in shielded box (John) 2. RFI considerations for new Education Center (Frank) 3. Monitor station developments (Rick) 4. Switching transient noise on GBT 5. Budget and manpower for the year (Rick, John) 6. Progress on suppressing RFI from equipment that has been measured in the anechoic chamber 7. Shielded room entrances (John, Rick) 8. Disabled persons transport on site for tours 9. Measurements of PC/Workstation in a shielded box (Chuck) 10. Emissions from the new diesels on site 11. GBT RFI 'harmful levels' document and measurement procedures (Rick) 12. Measurement of OVLBI transmission field strengths at the GBT. 13. RFI survey plan for GBT commissioning (Rick) 14. Lab RFI suppression efforts (Rick) 15. Interference at 1612.17 MHz 16. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date