Interference Protection Group meeting 3/21/00 Proposed Agenda Minutes of 1/18/00 meeting Interference reports Review of action items: 1. Budget and manpower for the year (Rick, John) 2. Status of SOHO proposal, automatic paging system, and moonbounce proposal 3. Site radio system (Chuck) 4. Microwave oven in shielded box (John) 5. RFI considerations for new Education Center (Frank) 6. Monitor station developments, summer student (Rick) 7. A turntable for the anechoic chamber (Rick) 8. Switching transient noise on GBT 9. Shielded room entrances (John, Rick) 10. Progress on suppressing RFI from equipment that has been measured in the anechoic chamber 11. Emissions from the new diesels on site 12. GBT RFI 'harmful levels' document and measurement procedures (Rick) 13. Measurement of OVLBI transmission field strengths at the GBT. 14. Disabled persons transport on site for tours 15. RFI survey plan for GBT commissioning (Rick) 16. Lab RFI suppression efforts (Rick) 17. Interference at 1612.17 MHz 18. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date