Interference Protection Group meeting 10/12/99 Proposed Agenda Minutes of 9/14/99 meeting Interference call-out reports Review of action items: 1. Automatic paging system (Tim, Rick) 2. A turntable for the anechoic chamber (Rick) 3. The last of the IPG funds 4. Transmissions from the 140-ft for the SOHO mission 5. Site radio system (Chuck) 6. Microwave oven in shielded test box (John) 7. RFI considerations for new Education Center (Frank) 8. Shielded room entrances (John, Rick) 9. Monitor station developments (Rick) 10. Progress on suppressing RFI from equipment that has been measured in the anechoic chamber 11. Emissions from the new diesels on site 12. GBT RFI 'harmful levels' document and measurement procedures (Rick) 13. Measurement of OVLBI transmission field strengths at the GBT. 14. Disabled persons transport on site for tours 15. RFI survey plan for GBT commissioning (Rick) 16. Lab RFI suppression efforts (Rick) 17. Interference at 1612.17 MHz 18. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date