Green Bank Coordination Meeting Summary

for Monday, Jun 10, 2002

Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Mon Oct 8-Dec 8 Construction of NRAO Education and Visitor Center . Wirt
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area [Meeting regularly scheduled for 1pm in the NCR]
 
Targets for 2002
DowDateDescriptionLocationPerson
Fri May 3 NO GBT azimuth movement (elevation allowed before and after grout installation) GBT AG
. May 3 Install new grout on GBT AG
. May 3 JL redundant chiller work JL Wirt
. May 3 Install Quad detector mechanical parts GBT Constantikes
. May 3 Replacce C band refrigerator GBT Simmons
. May 3 Fiber splicing in receiver room GBT White
Sat May 4 NO GBT azimuth movement (elevation movement after grout installation) GBT AG
. May 4 Complete installation of the grout GBT AG
. May 4 Install QD electronics, align detector, test GBT Constantikes
Sun May 5 NO GBT azimuth movement (elevation allowed) grout curing GBT AG
. May 5 Install QD electronics, align detector, test GBT Constantikes
Mon May 6 NO GBT azimuth movement (elevation allowed) grout curing GBT AG
. May 6 Install QD electronics, align detector, test GBT Constantikes
. May 6 Circular polarization tests (needs full system) GBT / JL Norrod
. May 6 Actuator trouble shooting and repair GBT Lacasse
. May 6 HVAC work GBT Morton
. May 6 Install RFI HVAC air vents in rcvr room servo racks GBT Simon
. May 6 Install VXWorks ADC in servo room GBT Constantikes
Tue May 7 NO GBT azimuth movement (elevation allowed) grout curing GBT AG
. May 7 Install QD electronics, align detector, test GBT Constantikes
. May 7 Actuator trouble shooting and repair (if BB possible) GBT Lacasse
. May 7 Clean RFI filters in FA GBT Morton
. May 7 Install air ducts for feed defroster GBT Simon
Wed May 8 NO GBT azimuth movement (elevation allowed) grout curing GBT AG
. May 8 Install QD electronics, align detector, test GBT Constantikes
. May 8 Install shielded filter boxes on FA servo GBT Lacasse
. May 8 Check MG set and servo transformer GBT Morton
. May 8 Install air ducts on feed defroster GBT Simon
Thu May 9 NO GBT azimuth movement (elevation motion) GBT AG
. May 9 Antenna moving tests GBT AG
. May 9 Initial FA measurements for QD GBT Constantikes
Fri May 10 Antenna moving tests GBT AG
. May 10 Initial FA measurements for QD GBT Constantikes
. May 10 Commissioning system tests GBT Maddalena
Sun Jun 2- 6 AAS Meeting in Albuquerque, NM . Jewell
Mon Jun 3 GBT proposal deadline (5pm) . Jewell
Tue Jun 4 Installation of Optical Guide Scope complete GBT Prestage
Wed Jun 5 Install 800 MHz feed GBT Chestnut/Morton
Thu Jun 6 WVMR Radio program taping (for 2nd Saturday at 10am) - S. Heatherly WVMR Station Lockman
Mon Jun 10- 15 IUCAF Spectrum Management Meeting JL Aud Emerson
Fri Jun 14 Site re-keying complete . Wirt
Sun Jun 16- 29 RARECATS JL Aud Heatherly
Mon Jun 24-Sep 1 Construction of Cable building expansion . Wirt
. Jun 24 Pre bid conference for New Dormitory JL Aud Holstine
Sat Jun 29 NRAO annual picnic Rec Area Rec Assn
Mon Jul 1 Install ladder cage on level 4 GBT Morton
Thu Jul 4 NRAO Holiday - Independence Day . .
. Jul 4 WVMR Radio program taping (for 2nd Saturday at 10am) - G. Langston WVMR Station Lockman
Fri Jul 5 NRAO Holiday . .
Sun Jul 7- 10 SARA JL Aud Heatherly
Fri Jul 12 Bids due for New Dormitory . Holstine
Sun Jul 14- 20 HOU I JL Aud Heatherly
Sun Jul 28-Aug 3 HOU II JL Aud Heatherly
Tue Jul 30-Apr 6 Construction of New Dormitory . Wirt
Thu Aug 1 WVMR Radio program taping (for 2nd Saturday at 10am) - J. Braatz WVMR Station Lockman
Mon Aug 12- 18 ERIRA, Penn State, Dan Reichart 40 Ft Heatherly
Fri Aug 30 Rewiring of power distribution complete (east feeder) . Holstine
. Aug 30 Complete installation of sidewalks GBT site Holstine
. Aug 30 GBT Inspection Plan Complete . Holstine
Mon Sep 2 NRAO Holiday - Labor Day . .
Thu Sep 5 WVMR Radio program taping (for 2nd Saturday at 10am) - D. Balser WVMR Station Lockman
Sat Sep 14- 15 Hunter's safety class JL Aud Stewart
Tue Oct 1 GBT proposal deadline . Jewell
Thu Oct 3 WVMR Radio program taping (for 2nd Saturday at 10am) - R. Maddalena WVMR Station Lockman
Thu Oct 10- 12 Scientific Seminar in Honor of Kellerman JL Aud Fisher
Mon Oct 14 NRAO Holiday - Columbus Day . .
Thu Oct 17- 18 AUI Board of Trustees Meeting JL Aud Jewell
Thu Nov 7 WVMR Radio program taping (for 2nd Saturday at 10am) - P. Jewell WVMR Station Lockman
Thu Nov 28 NRAO Holiday - Thanksgiving Day . .
Fri Nov 29 NRAO Holiday . .
Sat Nov 30 Mothball 20m . Chestnut
Tue Dec 24 NRAO Holiday . .
Wed Dec 25 NRAO Holiday - Christmas Day . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area [Meeting regularly scheduled for 1pm in the NCR]
 
Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
Computer, Software Engineer II GB GB GB2243 . . . .
Electronics, Digital Engineer III GB GB GB2244 . . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . (06/06/02) B. Mason .
Telescope Operations, Chief Ant Eng GB GB GB2242 05/09/02 . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 340 Prime F. Linear/Circular 1 14 70 . .
.385 - .520 450 Prime F. Linear/Circular 1 . 57 . .
.510 - .690 600 Prime F. Linear/Circular 1 . 48 . .
.680 - .920 800 Prime F. Linear/Circular 1 . 24.5 . .
.910 - 1.23 PF2 Prime F. Linear/Circular 1 . 21.9 Dev A - (09/01/02)
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 . .
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 . .
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 . .
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 . .
12.00 - 15.4 Ku Greg. Circular 2 14 24 - 30 . .
18.00 - 22.4 K Greg. Circular 2 19 38 . .
22.00 - 26.50 K Greg. Circular 2 23 42 . .
26.50 - 40.00 Ka Greg. Circular 2 . . Dev .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 Storage * .
68.00 - 92.00 W Greg. Linear 2 70 . Dev .
90.00 - 115.00 W Greg. . . . . Hold .
Holography . Greg . . . . . .
Notes: Status - Blank => rcvr on GBT and operational; Dev => rcvr in development; Hold => rcvr planned but development not yet started; Repair => rcvr in shop for repairs or modification; Storage => reveiver ready for use but currently in storage Date - A => available date; N => needed date * => requires at least three weeks to install on telescope from storage .
 