Green Bank Coordination Meeting Summary

for Monday, Oct 15, 2001

Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Tue Oct 9-Mar 30 Construction of NRAO Townhouses . Holstine
. Oct 9- 19 Aips++ Working Group . Jewell
. Oct 9 Quarterly Reports Due . Jewell
Wed Oct 10 Training PCHS, RESA IV JL Aud Heatherly
Thu Oct 11- 14 Forsyth Astronomical Society, Terry Shore 40 Ft Heatherly
. Oct 11- 12 Deer hunt on NRAO property . Holstine
. Oct 11- 12 Teacher's training, Trussler JL Aud Heatherly
Fri Oct 12 Use of Mainsaver within Operations group . Lawrence
. Oct 12 Installation of A/C in the Machine Shop . Wirt
. Oct 12 Installation of water to GBT warehouse . Wirt
. Oct 12 Connect GBT Anemometer to the system GBT Simon
Mon Oct 15-Dec 31 Start construction of NRAO Education and Visitor Center . Wirt
Fri Oct 19- 21 Glenelg High School 40 Ft Heatherly
Wed Oct 24 Jansky Symposium in CV CV .
Fri Oct 26- 28 Villanova University 40 Ft Heatherly
. Oct 26 Jansky Lecture JL Aud .
Tue Oct 30 Installation of Optical Guide Scope complete GBT Prestage
. Oct 30 Quadrant detector installation complete GBT Prestage
. Oct 30 Detailed Requirements for Observing Asistant III program . Lawrence
. Oct 30 Install conduit to weather tower GBT site Wirt
. Oct 30 Installation of sidewalks GBT site Holstine
. Oct 30 Machine Shop Renovations . Holstine
Thu Nov 1 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT Prestage
. Nov 1 New main breaker for power distribution installed . Holstine
. Nov 1 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - G. Langston . Lockman
Fri Nov 2 Rewire site switch (site power shutdown for 2-3 days) . Holstine
Wed Nov 7 Rewiring of power distribution complete . Holstine
Fri Nov 9- 10 GBT and 20m ties experiment (24 hours) GBT, 20m Ghigo
Mon Nov 12- 13 NRAO Education & Public Outreach (EPO) Roundtable JL Aud Lockman
Thu Nov 15 Begin documentation of R&R maintenance procedures using new system . Meadows
. Nov 15 RESA IV Science Bowl JL Aud Heatherly
Fri Nov 16- 17 GBT and 20m ties experiment (backup experiment - 24 hours) GBT, 20m Ghigo
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Fri Nov 30 Mothball 20m . Chestnut
. Nov 30 Repair and installation of track covers complete GBT Prestage
Sat Dec 1 Expansion of Computer Server Room JL Prestage
. Dec 1 Complete design of new dormitory . Holstine
Thu Dec 6 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - D. Balsar . Lockman
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Sun Dec 30 Cryo compressor number 6 (spare) fabricated. . Prestage
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area [Meeting regularly scheduled for 1pm in the NCR] **** Holiday on Monday Oct 8 - Meeting will be held on Tues ****
 
Targets for 2002
DowDateDescriptionLocationPerson
Thu Jan 3 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - F. Ghigo . Lockman
Thu Feb 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - J. Braatz . Lockman
Thu Feb 28 Planned termination of OVLBI operations GB Jewell
Thu Mar 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - R. Maddelena . Lockman
Sun May 19- 25 Chautauqua Course JL Aud Heatherly
Mon Jun 10- 15 IUCAF Spectrum Management Meeting JL Aud .
Sun Jun 16- 29 RARECATS JL Aud Heatherly
Sun Jul 7- 10 SARA JL Aud Heatherly
Sun Jul 14- 20 HOU I JL Aud Heatherly
Sun Jul 28-Aug 3 HOU II JL Aud Heatherly
Wed Oct 9- 11 Scientific Seminar in Honor of Kellerman JL Aud Jewell
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area [Meeting regularly scheduled for 1pm in the NCR] **** Holiday on Monday Oct 8 - Meeting will be held on Tues ****
 
Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
MIS/Safety, Secretary GB CV CV2221 08/31/01 . . .
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Eng. GB GB GB2221 . . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 (01/01/02) J. Acree .
Mechanical Eng., Machinist GB GB GB2224 07/25/01 . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . (06/01/02) B. Mason .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 3 Prime F. Linear/Circular 1 14 70 . .
.385 - .520 4 Prime F. Linear/Circular 1 . 57 . .
.510 - .690 6 Prime F. Linear/Circular 1 . 48 . .
.680 - .920 8 Prime F. Linear/Circular 1 . 24.5 . .
.910 - 1.23 A Prime F. Linear/Circular 1 . 21.9 Dev .
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 . .
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 . .
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 Storage * .
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 . .
12.00 Ku Greg. Circular 2 14 24 - 30 . .
18.00 - 22.4 K Greg. Circular 2 19 38 . .
22.00 - 26.50 K Greg. Circular 2 23 42 . .
26.50 - 40.00 Ka Greg. Circular 2 . . Dev .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 Storage * .
68.00 - 92.00 W Greg. Linear 2 70 . Dev .
90.00 - 115.00 W Greg. . . . . Hold .
Notes: Status - Blank => rcvr on GBT and operational; Dev => rcvr in development; Hold => rcvr planned but development not yet started; Repair => rcvr in shop for repairs or modification; Storage => reveiver ready for use but currently in storage Date - A => available date; N => needed date * => requires at least three weeks to install on telescope from storage .
 
Targets  Open Positions   GBT Receivers   Past Targets  
GB Telescope Operations Home Page   GB Home Page  

Generated by C.Bignell 10/10/2001