Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-Sep 30 Terminate new fiber in lab JL Ford
Wed Sep 19 PCHS training, RESA IV JL Aud Heatherly
Fri Sep 21 Colloquia, "Chandra Imaging of Cluster Cores", B. McNamara, 11:00am JL Aud Minter
. Sep 21 GBT Anenmometer installed GBT Simon
. Sep 21 Installation of phones in the warehouse complete . Simon
Mon Sep 24 Issue contract for new education center (awaiting AUI and NSF approval) . Holstine
Tue Sep 25- 26 OECD Task Force on Radio Astronomy JL Aud Jewell
. Sep 25 Site safety inspections GB Bolyard
Sat Sep 29 Deer hunt on NRAO property . Holstine
Sun Sep 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
. Sep 30 Installation of Optical Guide Scope complete GBT Prestage
. Sep 30 Use of Mainsaver within Operations group . Lawrence
. Sep 30 Cryo compressor number 5 fabricated. . Prestage
. Sep 30 Last Day of NRAO Fiscal Year . Holstine
. Sep 30 GBT Listening stations completed and tested GBT Simon
Mon Oct 1 Install conduit to weather tower GBT site Wirt
. Oct 1 Installation of hoist pad, access pad and sidewalks GBT site Holstine
. Oct 1 Install drainage system for Laser Monument ZY105 GBT site Wirt
. Oct 1 Installation of A/C in the Machine Shop . Wirt
. Oct 1 Machine Shop Renovations . Holstine
. Oct 1-Jan 30 Construction of NRAO Townhouses . Holstine
. Oct 1 Installation of water and septic to GBT warehouse . Wirt
Thu Oct 4 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - P. Jewell . Lockman
. Oct 4- 6 Deer hunt on NRAO property . Holstine
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 Start construction of NRAO Education and Visitor Center . Wirt
. Oct 8 NRAO Holiday - Columbus Day . .
Tue Oct 9- 19 Aips++ Working Group . Jewell
Thu Oct 11- 14 Forsyth Astronomical Society, Terry Shore 40 Ft Heatherly
. Oct 11- 12 Deer hunt on NRAO property . Holstine
Fri Oct 19- 21 Glenelg High School 40 Ft Heatherly
Sun Oct 21 Expansion of Computer Server Room (awaiting new machines) JL Prestage
. Oct 21- 24 Real Time Programmer's Conference JL Aud Hunt/Prestage
Fri Oct 26- 28 Villanova University 40 Ft Heatherly
. Oct 26 Jansky Lecture JL Aud .
Tue Oct 30 Quadrant detector installation complete GBT Prestage
. Oct 30 Detailed Requirements for Observing Asistant III program . Lawrence
. Oct 30 Cryo compressor number 6 (spare) fabricated. . Prestage
Thu Nov 1 Mothball 20m . Chestnut
. Nov 1 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT Prestage
. Nov 1 New main breaker for power distribution installed . Holstine
. Nov 1 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - G. Langston . Lockman
Fri Nov 2 Rewire site switch . Holstine
Wed Nov 7 Rewiring of power distribution complete . Holstine
Mon Nov 12- 13 NRAO Education & Public Outreach (EPO) Roundtable JL Aud Lockman
Thu Nov 15 Begin documentation of R&R maintenance procedures using new system . Meadows
. Nov 15 RESA IV Science Bowl JL Aud Heatherly
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Fri Nov 30 Repair and installation of track covers complete GBT Prestage
Sat Dec 1 Complete design of new dormitory . Holstine
Thu Dec 6 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - D. Balsar . Lockman
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area ***** NOTE MEETING TIME CHANGE ***** Meetings are now scheduled at 1:00 pm on Mondays in the NCR
 
Targets for 2002
DowDateDescriptionLocationPerson
Thu Jan 3 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - F. Ghigo . Lockman
Thu Feb 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - J. Braatz . Lockman
Thu Mar 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - R. Maddelena . Lockman
Sun May 19- 25 Chautauqua Course JL Aud Heatherly
Mon Jun 10- 15 IUCAF Spectrum Management Meeting JL Aud .
Sun Jun 16- 29 RARECATS JL Aud Heatherly
Sun Jul 14- 20 HOU I JL Aud Heatherly
Sun Jul 28-Aug 3 HOU II JL Aud Heatherly
Fri Aug 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area ***** NOTE MEETING TIME CHANGE ***** Meetings are now scheduled at 1:00 pm on Mondays in the NCR
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
MIS/Safety, Secretary GB CV CV2221 08/31/01 . . .
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Eng. GB GB GB2221 . . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Mechanical Eng., Machinist GB GB GB2224 07/25/01 . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 . .
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 . .
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 . .
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 . .
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 Dev .
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 . .
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 Repair N 09/22/01
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 Repair .
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 . .
12.00 Ku Greg. Circular 2 14 24 - 30 . .
18.00 - 22.4 K Greg. Circular 2 19 38 . .
22.00 - 26.50 K Greg. Circular 2 23 42 . .
26.50 - 40.00 Ka Greg. ? ? 25 . Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 Dev A 11/01/01
68.00 - 95.00 W Greg. . . . . Hold .
90.00 - 115.00 W Greg. . . . . Hold .