Green Bank Coordination Meeting Summary

for Monday, Sep 17, 2001

Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-Sep 30 Terminate new fiber in lab JL Ford
Tue Sep 11 GB Projects planning meeting (10am-3pm) JL Aud Prestage
Wed Sep 12 GB Middle School training, RESA IV JL Aud Heatherly
Thu Sep 13- 14 NRAO Education & Public Outreach (EPO) Roundtable JL Aud Lockman
Fri Sep 14 Install conduit to weather tower GBT site Wirt
. Sep 14 Install drainage system for Laser Monument ZY105 GBT site Wirt
. Sep 14 Last day to submit requisitions . Holstine
. Sep 14 GBT PA system complete and balanced GBT Simon
Mon Sep 17 Issue contract for new education center (awaiting AUI and NSF approval) . Holstine
Wed Sep 19 PCHS training, RESA IV JL Aud Heatherly
Fri Sep 21 Expansion of Computer Server Room JL Beverage
. Sep 21 Colloquia, "Chandra Imaging of Cluster Cores", B. McNamara, 11:00am JL Aud Minter
. Sep 21 GBT Anenmometer installed GBT Simon
. Sep 21 Installation of phones in the warehouse and at GBT gate complete . Simon
Tue Sep 25- 26 OECD Task Force on Radio Astronomy JL Aud Jewell
Sun Sep 30 Start construction of NRAO Education and Visitor Center . Wirt
. Sep 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
. Sep 30 Installation of Optical Guide Scope complete GBT Prestage
. Sep 30 Use of Mainsaver within Operations group . Lawrence
. Sep 30 Cryo compressor number 5 fabricated. . Prestage
. Sep 30 Last Day of NRAO Fiscal Year . Holstine
. Sep 30 GBT Listening stations completed and tested GBT Simon
Mon Oct 1 Installation of hoist pad, access pad and sidewalks GBT site Holstine
. Oct 1 Installation of A/C in the Machine Shop . Wirt
. Oct 1 Machine Shop Renovations . Holstine
. Oct 1-Jan 30 Construction of NRAO Townhouses . Holstine
. Oct 1 Installation of water and septic to GBT warehouse . Wirt
Thu Oct 4 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - P. Jewell . Lockman
. Oct 4- 6 Deer hunt on NRAO property . Holstine
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 NRAO Holiday - Columbus Day . .
Thu Oct 11- 14 Forsyth Astronomical Society, Terry Shore 40 Ft Heatherly
. Oct 11- 12 Deer hunt on NRAO property . Holstine
Fri Oct 19- 21 Glenelg High School 40 Ft Heatherly
Sun Oct 21- 24 Real Time Programmer's Conference JL Aud Hunt/Prestage
Fri Oct 26- 28 Villanova University 40 Ft Heatherly
. Oct 26 Jansky Lecture JL Aud .
Tue Oct 30 Quadrant detector installation complete GBT Prestage
. Oct 30 Detailed Requirements for Observing Asistant III program . Lawrence
. Oct 30 Cryo compressor number 6 (spare) fabricated. . Prestage
Thu Nov 1 Mothball 20m . Chestnut
. Nov 1 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT Prestage
. Nov 1 New main breaker for power distribution installed . Holstine
. Nov 1 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - G. Langston . Lockman
Wed Nov 7 Rewire site switch . Holstine
. Nov 7 Rewiring of power distribution complete . Holstine
Thu Nov 15 Begin documentation of R&R maintenance procedures using new system . Meadows
. Nov 15 RESA IV Science Bowl JL Aud Heatherly
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Fri Nov 30 Repair and installation of track covers complete GBT Prestage
Sat Dec 1 Complete design of new dormitory . Holstine
Thu Dec 6 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - D. Balsar . Lockman
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area ***** NOTE MEETING TIME CHANGE ***** Meetings are now scheduled at 1:45pm on Mondays in the NCR
 
Targets for 2002
DowDateDescriptionLocationPerson
Thu Jan 3 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - F. Ghigo . Lockman
Thu Feb 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - J. Braatz . Lockman
Thu Mar 7 WVMR radio program taping (at 2pm - broadcast 2nd Sat) - R. Maddelena . Lockman
Sun May 19- 25 Chautauqua Course JL Aud Heatherly
Mon Jun 10- 15 IUCAF Spectrum Management Meeting JL Aud .
Sun Jun 16- 29 RARECATS JL Aud Heatherly
Sun Jul 14- 20 HOU I JL Aud Heatherly
Sun Jul 28-Aug 3 HOU II JL Aud Heatherly
Fri Aug 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area ***** NOTE MEETING TIME CHANGE ***** Meetings are now scheduled at 1:45pm on Mondays in the NCR
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
MIS/Safety, Secretary GB CV CV2221 08/31/01 . . .
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Eng. GB GB GB2221 . . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Mechanical Eng., Machinist GB GB GB2224 07/25/01 . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 . .
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 . .
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 . .
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 . .
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 Dev .
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 . .
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 Repair N 09/22/01
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 Repair .
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 . .
12.00 Ku Greg. Circular 2 14 24 - 30 . .
18.00 - 22.4 K Greg. Circular 2 19 38 . .
22.00 - 26.50 K Greg. Circular 2 23 42 . .
26.50 - 40.00 Ka Greg. ? ? 25 . Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 Dev A 11/01/01
68.00 - 95.00 W Greg. . . . . Hold .
90.00 - 115.00 W Greg. . . . . Hold .
Notes: Status - Blank => rcvr on GBT and operational; Dev => rcvr in development; Hold => rcvr planned but development not yet started; Repair => rcvr in shop for repairs or modification Date - A => available date; N => needed date .
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page

Generated by C.Bignell 09/10/2001