Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-Jul 30 Terminate new fiber in lab JL Ford
Sun Jul 29-Aug 11 RARECATS JL Aud Heatherly
Mon Jul 30 Install conduit for telephone at GBT gate GBT site Wirt
. Jul 30 Install 2 conduits (one to warehouse & one to hoist pad) from hand hole GBT site Wirt
Wed Aug 1 Colloquia, "Virginia Tech Spectral Line Survey", B.Dennison, 3:30pm NCR Minter
Fri Aug 3 Installation of Optical Guide Scope complete GBT Prestage
. Aug 3 Install conduit to weather tower GBT site Wirt
. Aug 3 Install drainage system for Laser Monument ZY105 GBT site Wirt
Wed Aug 8 Begin Operations of GBT from the Janksy Lab . Bignell
Fri Aug 10 Installation of A/C in the Machine Shop . Wirt
Sun Aug 12- 19 ERIRA, Penn State, Dan Reichart 40 Ft Heatherly
Mon Aug 13 Colloquia, "Single Pulses of Pulsars at Low Freq.", A. Asgekar, 3:30pm JL Aud Minter
Tue Aug 14 Begin Astronomical Observations GBT Prestage
Wed Aug 15 Test of GBT VLBI equipment (using the VLBA) GBT Ghigo
. Aug 15 Colloquia, "TBD", B. McNamara, 3:30pm JL Aud Minter
Fri Aug 24 Installation of hoist pad, access pad and sidewalks GBT site Holstine
Wed Aug 29- 30 Mainsaver Training (general and supervisor) JL Aud Lawrence
Thu Aug 30 Complete Evaluation of the Feed Arm Laser (lower right unit) GBT Prestage
. Aug 30 Use of Mainsaver within Operations group . Lawrence
. Aug 30 Detailed Requirements for Observing Asistant III program . Lawrence
. Aug 30 Machine Shop Renovations . Holstine
. Aug 30 Expansion of Computer Server Room JL Beaverage
Fri Aug 31 GB deadline for NRAO Newsletter articles . Langston
Sat Sep 1 Mothball 20m . Chestnut
. Sep 1 Begin Weekend operations on the GBT GBT Prestage
Mon Sep 3 NRAO Holiday - Labor Day . .
Wed Sep 5 Start construction of NRAO Education and Visitor Center . Wirt
Wed Sep 12 GB Middle School trining, RESA IV JL Aud Heatherly
Thu Sep 13- 14 EPO Roundtable JL Aud Lockman
Sat Sep 15 Begin documentation of R&R maintenance procedures using new system . Meadows
Wed Sep 19 PCHS training, RESA IV JL Aud Heatherly
Fri Sep 21 Install warehouse bathroom and septic system GBT site Holstine
Sun Sep 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
. Sep 30 Repair and installation of track covers complete GBT Prestage
. Sep 30 Quadrant detector installation complete GBT Prestage
. Sep 30 Second of the new cryo compressors fabricated. . Prestage
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 NRAO Holiday - Columbus Day . .
Thu Nov 1 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT Prestage
. Nov 1 New main breaker for power distribution installed . Holstine
Wed Nov 7 Rewire site switch . Holstine
. Nov 7 Rewiring of power distribution complete . Holstine
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets for 2002
DowDateDescriptionLocationPerson
Fri Aug 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Sr. Systems Analyst GB GB GB2219 . . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Mechanical Eng., Machinist GB GB GB2224 07/25/01 . . .
Plant Maintenance, Electrician GB GB GB2175 10/30/00 (08/01/01) B. Goldizen .
Plant Maintenance, HVAC Plumb. Mech. GB GB GB2193 04/04/01 07/30/01 L. Price .
Plant Maintenance, Painter GB GB GB2194 04/04/01 . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . . . .
Telescope Operations, Tel. Operator GB GB GB2225 . 07/30/01 K. Gum .
Telescope Operations, Tele. Mech. GB GB GB2183 03/19/01 (08/01/01) E. Friel .
Telescope Operations, Tel. Operator GB OVLBI GB2226 07/20/01 . . Pt Te
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 12/01/00 (03/30/01)
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 12/01/00 (03/30/01)
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 12/01/00 (03/30/01)
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 12/01/00 (03/30/01)
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 (09/01/01) 2001 +
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 10/20/00 (03/30/01)
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 10/20/00 (03/30/01)
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 10/20/00 (03/30/01)
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 10/20/00 (03/30/01)
12.00 Ku Greg. Circular 2 14 24 - 30 10/20/00 (03/30/01)
18.00 - 22.4 K Greg. Circular 2 19 38 11/16/00 (03/30/01)
22.00 - 26.50 K Greg. Circular 2 23 42 11/16/00 (03/30/01)
26.50 - 40.00 Ka Greg. ? ? 25 . On Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 (09/30/01) (11/01/01)
68.00 - 95.00 W Greg. . . . . On Hold .
90.00 - 115.00 W Greg. . . . . On Hold .
Notes: () - target date; * - share same dewar; + - dates dependent on GBT contractor ? - undecided: multibeams are dual polarized .
 