Green Bank Coordination Meeting Summary

for Monday, Jul 16, 2001

Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-Jul 30 Terminate new fiber in lab JL Ford
Tue May 1-Jul 13 Set GBT Panel corners to best surface (bird bath to accommodate painting) GBT Prestage
Wed Jul 4 NRAO Holiday - Independence Day . .
Thu Jul 5 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Braatz . Lockman
Wed Jul 11- 13 Business Managers Meeting CV Holstine
Sun Jul 15- 18 SARA JL Aud Heatherly
. Jul 15 Installation of Optical Guide Scope complete GBT Prestage
Mon Jul 16 Restart of GBT commissioning GBT Prestage
. Jul 16- 18 Business Managers (Administrative Review) Meeting CV Holstine
Tue Jul 17 Bid opening for new NRAO Education and Visitor Center . Holstine
Thu Jul 19 Colloquia, "Distribution of Warm Ionized Medium...", Lazio, 3:30pm JL Aud Minter
Fri Jul 20 Install conduit for telephone at GBT gate GBT site Wirt
. Jul 20 Install 2 conduits (one to warehouse & one to hoist pad) from hand hole GBT site Wirt
Sat Jul 21- 27 Hands-on Universe Workshop JL Aud Heatherly
Fri Jul 27 Install conduit to weather tower GBT site Wirt
. Jul 27 Install drainage system for Laser Monument ZY105 GBT site Wirt
. Jul 27 Installation of A/C in the Machine Shop . Wirt
Sat Jul 28 NRAO GB Summer Picnic Rec Area .
Sun Jul 29-Aug 11 RARECATS JL Aud Heatherly
Mon Jul 30 Repair and installation of track covers complete GBT Prestage
. Jul 30 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT Prestage
. Jul 30 Second of the new cryo compressors fabricated. . Prestage
. Jul 30 Detailed Requirements for Observing Asistant III program . Lawrence
Tue Jul 31 Test of GBT VLBI equipment (using the VLBA) GBT Ghigo
Wed Aug 1 Begin Operations of GBT from the Janksy Lab . Prestage
Sun Aug 12- 19 ERIRA, Penn State, Dan Reichart 40 Ft Heatherly
Mon Aug 13 Begin Astronomical Observations GBT Prestage
Thu Aug 16 Install GBT Feed Arm Lasers (middle units) GBT Prestage
Mon Aug 20 Start construction of NRAO Education and Visitor Center . Holstine
Fri Aug 24 Installation of hoist pad, access pad and sidewalks GBT site Holstine
Wed Aug 29- 30 Mainsaver Training (general and supervisor) JL Aud Lawrence
Thu Aug 30 Installation of the Feed Arm Lasers (upper units) GBT Prestage
. Aug 30 Quadrant detector installation complete GBT Prestage
. Aug 30 Use of Mainsaver within Operations group . Lawrence
Fri Aug 31 GB deadline for NRAO Newsletter articles . Langston
Sat Sep 1 Mothball 20m . Chestnut
. Sep 1 Begin Weekend operations on the GBT GBT Prestage
Mon Sep 3 NRAO Holiday - Labor Day . .
Wed Sep 12 GB Middle School trining, RESA IV JL Aud Heatherly
Thu Sep 13- 14 EPO Roundtable JL Aud Lockman
Sat Sep 15 Begin documentation of R&R maintenance procedures using new system . Meadows
Wed Sep 19 PCHS training, RESA IV JL Aud Heatherly
Fri Sep 21 Install warehouse bathroom and septic system GBT site Holstine
Sun Sep 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 NRAO Holiday - Columbus Day . .
Thu Nov 1 New main breaker for power distribution installed . Holstine
Wed Nov 7 Rewire site switch . Holstine
. Nov 7 Rewiring of power distribution complete . Holstine
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets for 2002
DowDateDescriptionLocationPerson
Fri Aug 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, JL Aud - JL Auditorium, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Technician GB GB GB2187 03/08/01 07-09-01 H. Guthrie .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Plant Maintenance, Electrician GB GB GB2175 10/30/00 (08/01/01) B. Goldizen .
Plant Maintenance, HVAC Plumb. Mech. GB GB GB2193 04/04/01 . . .
Plant Maintenance, Painter GB GB GB2194 04/04/01 . . .
Scientific Services, 3mm Pgm Scientist GB GB CV2153 . . . .
Telescope Operations, Tele. Mech. GB GB GB2183 03/19/01 . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 12/01/00 (03/30/01)
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 12/01/00 (03/30/01)
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 12/01/00 (03/30/01)
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 12/01/00 (03/30/01)
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 (09/01/01) 2001 +
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 10/20/00 (03/30/01)
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 10/20/00 (03/30/01)
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 10/20/00 (03/30/01)
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 10/20/00 (03/30/01)
12.00 Ku Greg. Circular 2 14 24 - 30 10/20/00 (03/30/01)
18.00 - 22.4 K Greg. Circular 2 19 38 11/16/00 (03/30/01)
22.00 - 26.50 K Greg. Circular 2 23 42 11/16/00 (03/30/01)
26.50 - 40.00 Ka Greg. ? ? 25 . On Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 (09/30/01) (11/01/01)
68.00 - 95.00 W Greg. . . . . On Hold .
90.00 - 115.00 W Greg. . . . . On Hold .
Notes: () - target date; * - share same dewar; + - dates dependent on GBT contractor ? - undecided: multibeams are dual polarized .
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page

Generated by C.Bignell 07/09/2001