Green Bank Coordination Meeting Summary

for Monday, May 14, 2001

Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-May 30 Terminate new fiber in lab JL Ford
Mon Apr 2-May 30 Ship all USNO Equipment (except Mark IV) 20 M Bignell/Chestnut
. Apr 2-May 11 Re-condition corner setting tools . Weadon/McKinnon
Tue May 1- 31 GBT Az wheel bearing replacment. GBT McKinnon
. May 1- 30 Set GBT Panel corners to best surface (bird bath to accommodate painting) GBT McKinnon
Mon May 7- 9 NRAO Visiting Committee Meeting CV Jewell
. May 7 Ship Mark IV equipment to Algonquin Park, CA . Ghigo/Morgan
. May 7- 28 Repair water tower (water conservation in effect) GB Holstine
Wed May 9 NRAO GB Colloquia, Nature of ISM in Low Surface B. Gal., L. Matthews (3:30) JL Aud Minter
Fri May 11 Tim Boyd, GHS Science 40 Ft Heatherly
Tue May 15 Install GBT Feed Arm Lasers (middle units) GBT McKinnon
. May 15 Installation of Feed Arm Laser (right lower unit) GBT McKinnon
. May 15 Use of Mainsaver within Operations group . Lawrence
. May 15 Preliminary VSOP2 proposal . Langston
Wed May 16 Installation of the Feed Arm Lasers (upper units) GBT McKinnon
Fri May 18- 19 Bud Oates, Astronomy Cliub 40 Ft Heatherly
Mon May 21 Issue RFQ for Construction of NRAO Education and Visitor Center . Holstine
. May 21- 23 50 Years of Galactic HI Surveys JL Aud Lockman
Tue May 22 Contract awarded for Construction of NRAO Education and Visitor Center . Holstine
Fri May 25 NRAO GB Colloquia, TBD, B. Mason (3:30) . Minter
. May 25- 27 Tim Spuck 40 Ft Heatherly
Mon May 28-Jun 2 Chatauqua Course JL Aud Heatherly
. May 28 NRAO Holiday - Memorial Day . .
Wed May 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
. May 30 Installation of Optical Guide Scope complete GBT McKinnon
. May 30 Repair and installation of track covers complete GBT McKinnon
. May 30 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT McKinnon
. May 30 Quadrant detector installation complete GBT McKinnon
. May 30 Installation of telephone to PF & subr. areas complete GBT McKinnon
. May 30 Second of the new cryo compressors fabricated. . McKinnon
. May 30 Position GBT reflector surface electronically to conform to Photgrammetry results . McKinnon
Fri Jun 1 GB deadline for NRAO Newsletter articles . Langston
. Jun 1 Begin Operations of GBT from the Janksy Lab . McKinnon
Sat Jun 2 Begin Weekend operations on the GBT GBT McKinnon
Sun Jun 3- 7 American Astronomical Society Meeting Pasadena .
Tue Jun 5 SAO Maser electronics upgraded (hot spare for Sigma Tau) GB Ford/Stennes
Thu Jun 7- 9 Gettysburg College 40 Ft Heatherly
. Jun 7 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Ghigo . Lockman
Sat Jun 9- 15 Hands-on Universe Workshop JL Aud Heatherly
Sun Jun 10- 15 NAIC-NRAO School on Single-Dish Radio Astronomy Arecibo Jewell
Fri Jun 15 Begin documentation of R&R maintenance procedures using new system . Meadows
Sun Jun 17- 30 RARECATS JL Aud Heatherly
Wed Jun 20- 21 Mainsaver Training (general and supervisor) JL Aud Lawrence
Sun Jul 1 Start construction of NRAO Education and Visitor Center . Holstine
. Jul 1 Test of GBT VLBI equipment (using the 20m) GBT Ghigo
. Jul 1 Conversion of Ops Manual using new templates . Lawrence
Wed Jul 4 NRAO Holiday - Independence Day . .
Thu Jul 5 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Braatz . Lockman
Sun Jul 15- 18 SARA JL Aud Heatherly
Sat Jul 21- 27 Hand-on Universe Workshop JL Aud Heatherly
Wed Jul 25- 27 NRAO Business Managers Meeting CV Holstine
Sat Jul 28 GB Annual Picnic Rec Area .
. Jul 28 NRAO GB Summer Picnic Rec Area .
Sun Jul 29-Aug 11 RARECATS JL Aud Heatherly
Wed Aug 1 New main breaker for power distribution installed . Holstine
. Aug 1 Rewire site switch . Holstine
. Aug 1 Rewiring of power distribution complete . Holstine
Sun Aug 12- 19 ERIRA, Penn State, Dan Reichart 40 Ft Heatherly
Fri Aug 31 GB deadline for NRAO Newsletter articles . Langston
Sat Sep 1 Mothball 20m . Chestnut
Mon Sep 3 NRAO Holiday - Labor Day . .
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 NRAO Holiday - Columbus Day . .
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets for 2002
DowDateDescriptionLocationPerson
Sun Jun 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
Computer, Programmer/Analyst GB . GB2166 . . . A
Fiscal, Accounting Clerk GB CV GB2203 . . . A
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Engineer GB GB GB2185 03/27/01 (05/21/01) J. Ray .
Electronics, Digital Engineer GB GB GB2199 . . . .
Electronics, Digital Technician GB GB GB2186 03/08/01 (06/01/01) N. Sharp .
Electronics, Digital Technician GB GB GB2187 03/08/01 . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Mechanical Engineering, Designer GB GB GB2189 03/14/01 . . .
Plant Maintenance, Electrician GB GB GB2175 10/30/00 (07/01/01) B. Goldizen .
Plant Maintenance, Engineer GB GB GB2111 02/15/01 . . .
Plant Maintenance, HVAC Plumb. Mech. GB GB GB2193 04/04/01 . . .
Plant Maintenance, Janitor GB GB GB2195 04/04/01 . . .
Plant Maintenance, Painter GB GB GB2194 04/04/01 . . .
Scientific Services, Deputy Assist. Dir. GB GB GB2181 01/12/01 (06/15/01) R. Prestage .
Scientific Services, Program Scientist GB GB CV2153 . . . .
Telescope Operations, GBT Operator GB GB GB2201 05/01/01 . . .
Telescope Operations, Tele. Mech. GB GB GB2183 03/19/01 . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 12/01/00 (03/30/01)
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 12/01/00 (03/30/01)
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 12/01/00 (03/30/01)
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 12/01/00 (03/30/01)
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 (09/01/01) 2001 +
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 10/20/00 (03/30/01)
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 10/20/00 (03/30/01)
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 10/20/00 (03/30/01)
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 10/20/00 (03/30/01)
12.00 Ku Greg. Circular 2 14 24 - 30 10/20/00 (03/30/01)
18.00 - 22.4 K Greg. Circular 2 19 38 11/16/00 (03/30/01)
22.00 - 26.50 K Greg. Circular 2 23 42 11/16/00 (03/30/01)
26.50 - 40.00 Ka Greg. ? ? 25 . On Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 (06/30/01) (11/01/01)
68.00 - 95.00 W Greg. . . . . On Hold .
90.00 - 115.00 W Greg. . . . . On Hold .
Notes: () - target date; * - share same dewar; + - dates dependent on GBT contractor ? - undecided: multibeams are dual polarized .
 