Green Bank Coordination Meeting Summary

for Monday, Apr 23, 2001

Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Targets for 2001
DowDateDescriptionLocationPerson
Mon Jan 22-Apr 30 Terminate new fiber in lab JL Ford
Thu Feb 1-Apr 30 Move JL Computer Servers (Halebopp) to the 85 Equipment room . Prestage
Fri Feb 2-Apr 30 Install Cabling in Residence Hall RH Holstine
Mon Apr 2-May 1 Ship all USNO Equipment (except Mark IV) 20 M Bignell/Chestnut
. Apr 2- 30 Re-condition corner setting tools . Weadon/McKinnon
Wed Apr 11 Installation of Feed Arm Laser (right lower unit) GBT McKinnon
Mon Apr 16 Installation of Optical Guide Scope complete GBT McKinnon
. Apr 16 Use of Mainsaver within Operations group . Lawrence
. Apr 16 Ship USNO Mark IV equipment to Kokee . Ghigo
Wed Apr 18- 21 Ardis Maciolek group 40 Ft Heatherly
Mon Apr 23 Installation of telephone to PF & subr. areas complete GBT McKinnon
. Apr 23- 27 Aips++ Developers Meeting JL Aud Braatz
Fri Apr 27- 29 Tim Spuck 40 Ft Heatherly
Mon Apr 30 Issue RFQ for Construction of NRAO Education and Visitor Center . Holstine
. Apr 30 Electronic Time Entry test using ADP eTime software complete GB Gibb
. Apr 30 MCB monitoring of backup pwr gen. and pwr xfmr complete. GBT McKinnon
. Apr 30 Quadrant detector installation complete GBT McKinnon
. Apr 30 Second of the new cryo compressors fabricated. . McKinnon
. Apr 30-May 2 GB Projects Meeting (RE plus all others) JL Aud/NCR Prestage
. Apr 30 Position GBT reflector surface electronically to conform to Photgrammetry results . McKinnon
. Apr 30 Preliminary VSOP2 proposal . Langston
Tue May 1 New main breaker for power distribution installed . Holstine
. May 1 Rewire site switch . Holstine
. May 1 Rewiring of power distribution complete . Holstine
. May 1 NRAO GB Colloquia, Brightest Explosions in the Universe, S. Kulkarni (3:30) JL Aud Minter
. May 1- 31 GBT Az wheel bearing replacment. GBT McKinnon
. May 1 Timothy Dennam 40 Ft Heatherly
. May 1- 30 Set GBT Panel corners to best surface (bird bath to accommodate painting) GBT McKinnon
Thu May 3- 4 Tygarts Valley High School 40 Ft Heatherly
. May 3 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Balser . Lockman
Sat May 5 Michelle Adams 40 Ft Heatherly
Mon May 7- 9 NRAO Visiting Committee Meeting CV Jewell
. May 7 Ship Mark IV equipment to Algonquin Park, CA . Ghigo/Morgan
Wed May 9 NRAO GB Colloquia, Nature of ISM in Low Surface B. Gal., L. Matthews (3:30) JL Aud Minter
Fri May 11 Tim Boyd, GHS Science 40 Ft Heatherly
Tue May 15 Install GBT Feed Arm Lasers (middle units) GBT McKinnon
Wed May 16 Installation of the Feed Arm Lasers (upper units) GBT McKinnon
Mon May 21- 23 50 Years of Galactic HI Surveys JL Aud Lockman
Tue May 22 Contract awarded for Construction of NRAO Education and Visitor Center . Holstine
Fri May 25 NRAO GB Colloquia, TBD, B. Mason (3:30) . Minter
Mon May 28-Jun 2 Chatauqua Course JL Aud Heatherly
. May 28 NRAO Holiday - Memorial Day . .
Wed May 30 Repair and installation of track covers complete GBT McKinnon
Fri Jun 1 GB deadline for NRAO Newsletter articles . Langston
. Jun 1 Begin Operations of GBT from the Janksy Lab . McKinnon
Sat Jun 2 Begin Weekend operations on the GBT GBT McKinnon
Sun Jun 3- 7 American Astronomical Society Meeting Pasadena .
Tue Jun 5 SAO Maser electronics upgraded (hot spare for Sigma Tau) GB Ford/Stennes
Thu Jun 7- 9 Gettysburg College 40 Ft Heatherly
. Jun 7 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Chigo . Lockman
Sat Jun 9- 15 Hands-on Universe Workshop JL Aud Heatherly
Sun Jun 10- 15 NAIC-NRAO School on Single-Dish Radio Astronomy Arecibo Jewell
Fri Jun 15 Begin documentation of R&R maintenance procedures using new system . Meadows
Sun Jun 17- 30 RARECATS JL Aud Heatherly
Wed Jun 20- 21 Mainsaver Training (general and supervisor) JL Aud Lawrence
Sun Jul 1 Start construction of NRAO Education and Visitor Center . Holstine
. Jul 1 Test of GBT VLBI equipment (using the 20m) GBT Ghigo
. Jul 1 Conversion of Ops Manual using new templates . Lawrence
Wed Jul 4 NRAO Holiday - Independence Day . .
Thu Jul 5 WVMR Recording of NRAO Radio Show (tba 2nd Sat of month) - Braatz . Lockman
Sun Jul 15- 18 SARA JL Aud Heatherly
Sat Jul 21- 27 Hand-on Universe Workshop JL Aud Heatherly
Wed Jul 25- 27 NRAO Business Managers Meeting CV Holstine
Sat Jul 28 GB Annual Picnic Rec Area .
Sun Jul 29-Aug 11 RARECATS JL Aud Heatherly
Sun Aug 12- 19 ERIRA, Penn State, Dan Reichart 40 Ft Heatherly
Fri Aug 31 GB deadline for NRAO Newsletter articles . Langston
Sat Sep 1 Mothball 20m . Chestnut
Mon Sep 3 NRAO Holiday - Labor Day . .
Sat Oct 6- 8 Penn State Erie, Darren Williams 40 Ft Heatherly
Mon Oct 8 NRAO Holiday - Columbus Day . .
Thu Nov 22 NRAO Holiday - Thanksgiving Day . .
Fri Nov 23 NRAO Holiday . .
Mon Dec 24 NRAO Holiday . .
Tue Dec 25 NRAO Holiday - Christmas Day . .
Mon Dec 31 NRAO Holiday . .
Notes: JL-Jansky Lab, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets for 2002
DowDateDescriptionLocationPerson
Sun Jun 2 Construction of NRAO Education and Visitor Center complete . Holstine
Notes: JL-Jansky Lab, NJL-New addition to the Jansky Lab, NCR - New Conference Room, TC - Tour Center, RA - Recreation Area
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

Open Positions
Division, PositionLocBudgetReq #PostingStartNameStatus
Computer, Programmer/Analyst GB . GB2166 . . . A
Computer, Assistant Scientist GB GB GB2191 03/08/01 . . .
Computer, Division Head GB GB GB2196 03/19/01 . . .
Computer, Systems Analyst GB GB GB2192 04/02/01 . . .
Electronics, Digital Engineer GB GB GB2185 03/27/01 . . .
Electronics, Digital Technician GB GB GB2186 03/08/01 . . .
Electronics, Digital Technician GB GB GB2187 03/08/01 . . .
Electronics, Interference Engineer GB GB GB2184 03/27/01 . . .
Mechanical Engineering, Designer GB GB GB2189 03/14/01 . . .
Plant Maintenance, Electrician GB GB GB2175 10/30/00 (07/01/01) B. Goldizen .
Plant Maintenance, Engineer GB GB GB2111 02/15/01 . . .
Plant Maintenance, HVAC Plumb. Mech. GB GB GB2193 04/04/01 . . .
Plant Maintenance, Janitor GB GB GB2195 04/04/01 . . .
Plant Maintenance, Painter GB GB GB2194 04/04/01 . . .
Scientific Services, Deputy Assist. Dir. GB GB GB2181 01/12/01 (06/15/01) R. Prestage .
Scientific Services, Program Scientist GB GB CV2153 . . . .
Telescope Operations, Tele. Mech. GB GB GB2183 03/19/01 . . .
() - Target date; Status: A-Awating approval, Pt-Part time, Tr-Transfer, Te-Temporary, F-Temporarily frozen
 
Targets  Open Positions   GBT Receivers   Past Targets   GB Home Page  

GBT Receivers
Receiver (GHz)BandLocationPolarization# BeamsTrec(k)Tsys(k)InstalledAvailable
.290 - .395 1-1* Prime F. Linear/Circular 1 14 70 12/01/00 (03/30/01)
.385 - .520 1-2 * Prime F. Linear/Circular 1 . 57 12/01/00 (03/30/01)
.510 - .690 1-3 * Prime F. Linear/Circular 1 . 48 12/01/00 (03/30/01)
.680 - .920 1-4 * Prime F. Linear/Circular 1 . 24.5 12/01/00 (03/30/01)
.910 - 1.23 2 Prime F. Linear/Circular 1 . 21.9 (09/01/01) 2001 +
1.15 - 1.73 L Greg. Linear/Circular 1 6 20 10/20/00 (03/30/01)
1.73 - 2.60 S Greg. Linear/Circular 1 8 - 12 24 10/20/00 (03/30/01)
3.95 - 5.85 C Greg. Linear/Circular 1 12 25 10/20/00 (03/30/01)
8.00 - 10.1 X Greg. Circular 1 13 21 - 27 10/20/00 (03/30/01)
12.00 Ku Greg. Circular 2 14 24 - 30 10/20/00 (03/30/01)
18.00 - 22.4 K Greg. Circular 2 19 38 11/16/00 (03/30/01)
22.00 - 26.50 K Greg. Circular 2 23 42 11/16/00 (03/30/01)
26.50 - 40.00 Ka Greg. ? ? 25 . On Hold .
40.00 - 50.00 Q Greg. Circular 4 30 35 - 160 (06/30/01) (11/01/01)
68.00 - 95.00 W Greg. . . . . On Hold .
90.00 - 115.00 W Greg. . . . . On Hold .
Notes: () - target date; * - share same dewar; + - dates dependent on GBT contractor ? - undecided: multibeams are dual polarized .
 