Project Start Date: Tue 1/2/01
Project Finish Date: Sun 5/5/02
Resources and Assignments | Percent_Work_Complete | Start | Finish | Work |
---|---|---|---|---|
Unassigned | 0% | Tue 1/2/01 | Mon 4/29/02 | 0 days |
Electronics ready for continuum commissioning | 0% | Tue 1/23/01 | Tue 1/23/01 | 0 days |
Electronics ready for spectral-line Commissioning | 0% | Fri 5/4/01 | Fri 5/4/01 | 0 days |
Spectrometer ready for general use | 0% | Fri 8/10/01 | Mon 8/13/01 | 0 days |
Electronics Ready for Doppler commissioning | 0% | Fri 5/4/01 | Fri 5/4/01 | 0 days |
Complete 40-52 GHz hardware | 0% | Tue 1/2/01 | Tue 1/2/01 | 0 days |
40-52 GHz Rcvr. ready for use | 0% | Tue 4/10/01 | Tue 4/10/01 | 0 days |
Spectral Processor ready for use | 0% | Tue 6/26/01 | Tue 6/26/01 | 0 days |
Prime Focus 2 Rcvr. ready for use | 0% | Tue 6/26/01 | Tue 6/26/01 | 0 days |
All hardware has been Implemented | 0% | Mon 4/29/02 | Mon 4/29/02 | 0 days |
GBT Observe Ready for stage 1 continuum commissioning | 0% | Thu 2/15/01 | Thu 2/15/01 | 0 days |
GBT Observe Ready for line commissioning | 0% | Mon 4/30/01 | Mon 4/30/01 | 0 days |
GBT Observe ready for Doppler experiments | 0% | Thu 5/31/01 | Thu 5/31/01 | 0 days |
GBT Observe ready for Holography | 0% | Mon 2/26/01 | Mon 2/26/01 | 0 days |
GBT Observe ready for general use | 0% | Mon 9/24/01 | Mon 9/24/01 | 0 days |
Aips++ Ready for Stage 2 Cont. Commissioning | 0% | Wed 1/10/01 | Wed 1/10/01 | 0 days |
Aips++ Ready for Final Cont. Commissioning | 0% | Fri 1/19/01 | Fri 1/19/01 | 0 days |
Aips++ Ready for Holography Commissioning | 0% | Wed 4/4/01 | Wed 4/4/01 | 0 days |
Aips++ Ready for Line Commissioning | 0% | Tue 5/8/01 | Tue 5/8/01 | 0 days |
Aips++ Ready for General Use | 0% | Tue 9/25/01 | Tue 9/25/01 | 0 days |
PF Focus track ready | 0% | Mon 7/9/01 | Mon 7/9/01 | 0 days |
Preliminary Greg. Focus tracking ready | 100% | Fri 8/3/01 | Fri 8/3/01 | 0 days |
High Frequency Greg. focus tracking ready | 0% | Thu 11/1/01 | Thu 11/1/01 | 0 days |
Optical Pointing Complete | 0% | Tue 7/3/01 | Tue 7/3/01 | 0 days |
PF Pointing complete | 0% | Fri 8/17/01 | Fri 8/17/01 | 0 days |
Preliminary Gregorian pointing complete | 100% | Wed 9/5/01 | Wed 9/5/01 | 0 days |
Gregorian high frequency pointing complete | 0% | Fri 11/23/01 | Fri 11/23/01 | 0 days |
1st surface setting | 0% | Fri 9/21/01 | Fri 9/21/01 | 0 days |
2nd surface setting | 0% | Wed 10/24/01 | Wed 10/24/01 | 0 days |
Final Surface setting | 0% | Tue 10/23/01 | Tue 10/23/01 | 0 days |
PF 800 MHz ready for experiments | 0% | Mon 1/14/02 | Mon 1/14/02 | 0 days |
1-2 GHz ready for experiments | 0% | Thu 1/17/02 | Thu 1/17/02 | 0 days |
12-18 GHz ready for experiments | 0% | Thu 1/24/02 | Thu 1/24/02 | 0 days |
40-52 GHz ready for experiments | 0% | Mon 2/11/02 | Mon 2/11/02 | 0 days |
PF 300 MHz ready for experiments | 0% | Thu 2/28/02 | Thu 2/28/02 | 0 days |
2-3 GHz ready for experiments | 0% | Fri 3/15/02 | Fri 3/15/02 | 0 days |
4-6 GHz ready for experiments | 0% | Tue 3/19/02 | Tue 3/19/02 | 0 days |
8-10 GHz Ready for Experiments | 0% | Wed 3/27/02 | Wed 3/27/02 | 0 days |
18-26 GHz ready for experiments | 0% | Wed 4/10/02 | Wed 4/10/02 | 0 days |
PF2 ready for experiments | 0% | Wed 4/17/02 | Wed 4/17/02 | 0 days |
Aips++ Ready for Stage 1 Cont. Commissioning | 0% | Tue 1/2/01 | Tue 1/2/01 | 0 days |
Preliminary VLBI hardware ready | 0% | Mon 6/4/01 | Mon 6/4/01 | 0 days |
VLB/S2 hardware ready for general users. | 0% | Mon 4/29/02 | Mon 4/29/02 | 0 days |
GBT Observe Ready for stage 2 continuum commissioning | 0% | Fri 6/29/01 | Fri 6/29/01 | 0 days |
Optical pointing telescope ready for commissioning | 0% | Wed 1/31/01 | Wed 1/31/01 | 0 days |
Holography hardware ready for commissioning | 0% | Thu 2/8/01 | Thu 2/8/01 | 0 days |
All receivers have been commissioned | 0% | Wed 4/17/02 | Wed 4/17/02 | 0 days |
Measure plate scale | 80% | Mon 2/26/01 | Mon 7/9/01 | 0 days |
Commissioners | 20% | Tue 1/2/01 | Fri 5/3/02 | 508 days |
DCR tests | 100% | Wed 1/10/01 | Thu 1/11/01 | 1 day |
Test Switch Sig Sel | 0% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Verify M&C manager robustness - Spectrometer | 100% | Fri 3/2/01 | Tue 3/6/01 | 3 days |
Measure Spectrometer bandpass on CW signal - low speed | 20% | Fri 4/20/01 | Fri 5/4/01 | 5 days |
Measure Spectrometer bandpass on CW signal - high speed | 19% | Mon 7/2/01 | Thu 7/12/01 | 3 days |
Measure Spectrometer bandpass on CW signal - 9-level | 3% | Tue 7/3/01 | Mon 7/16/01 | 2 days |
Implement Spectrometer pulsar mode | 100% | Fri 7/6/01 | Fri 7/13/01 | 5 days |
Verify M&C manager robustness - LO1 Counter | 0% | Thu 3/29/01 | Mon 4/2/01 | 2 days |
Verify M&C manager robustness - Holography | 0% | Thu 2/1/01 | Fri 2/2/01 | 2 days |
Measure Holography phase stability on CW signal | 0% | Thu 2/8/01 | Thu 2/8/01 | 1 day |
Verify 40-52 GHz M&C manager | 0% | Mon 4/9/01 | Tue 4/10/01 | 1.5 days |
Implement spectral Line - SP | 50% | Thu 3/8/01 | Wed 3/28/01 | 5 days |
Implement pulsar - SP | 0% | Tue 6/19/01 | Tue 6/26/01 | 5 days |
Verify PF2 M&C manager | 0% | Tue 6/26/01 | Tue 6/26/01 | 1 day |
Verify ephemeredes calculations | 50% | Wed 1/3/01 | Tue 1/9/01 | 5 days |
Verify refraction calculations | 50% | Tue 1/9/01 | Mon 1/22/01 | 5 days |
Verify proper use of pointing coefficients | 100% | Mon 1/15/01 | Mon 1/15/01 | 1 day |
Determine cross scans optimum parameters(f) | 0% | Tue 2/13/01 | Wed 2/14/01 | 0.5 days |
Determine focus scans optimum parameters(f) | 0% | Wed 2/14/01 | Thu 2/15/01 | 0.5 days |
Determine 5-point optimum parameters(f) | 0% | Thu 3/29/01 | Thu 3/29/01 | 0.5 days |
Determine OTF optimum mapping parameters | 0% | Thu 6/21/01 | Thu 6/21/01 | 0.5 days |
Determine beam-switching parameters | 0% | Tue 6/26/01 | Wed 6/27/01 | 0.5 days |
Determine polarization switching parameters | 0% | Wed 6/27/01 | Thu 6/28/01 | 0.5 days |
Verify continuum tracking observing script | 100% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement and verify continuum cross-scans observing script | 100% | Wed 1/24/01 | Wed 1/24/01 | 1 day |
Implement and verify PF and Greg. focus tracking script | 25% | Thu 1/18/01 | Tue 2/13/01 | 2 days |
Implement and verify continuum OTF mapping observing script | 74% | Fri 2/9/01 | Fri 2/16/01 | 2 days |
Implement and verify continuum beam-switching observing script | 0% | Wed 2/21/01 | Wed 2/21/01 | 1 day |
Implement and verify continuum polarization-switching observing script | 0% | Tue 2/20/01 | Tue 2/20/01 | 1 day |
Implement and verify continuum on-off observing script | 0% | Fri 6/29/01 | Mon 7/2/01 | 0.5 days |
Implement and verify continuum 5-point observing script | 0% | Mon 7/2/01 | Mon 7/2/01 | 0.5 days |
Implement and verify continuum grid mapping observing script | 0% | Fri 7/13/01 | Mon 7/16/01 | 1 day |
Verify line tracking observing script | 100% | Mon 4/30/01 | Mon 4/30/01 | 1 day |
Implement and verify line beam-switching observing script | 0% | Wed 7/18/01 | Wed 7/18/01 | 0.5 days |
Implement and verify line polarization-switching observing script | 0% | Wed 7/18/01 | Thu 7/19/01 | 0.5 days |
Implement and verify line cross-scan observing script | 0% | Thu 7/19/01 | Fri 7/20/01 | 1 day |
Implement and verify line 5-point observing script | 0% | Thu 7/19/01 | Fri 7/20/01 | 1 day |
Implement and verify line OTF mapping observing script | 0% | Thu 9/20/01 | Fri 9/21/01 | 2 days |
Implement and verify line Grid mapping observing script | 0% | Mon 9/24/01 | Mon 9/24/01 | 1 day |
Implement Doppler tracking algorithm | 0% | Tue 5/22/01 | Tue 5/29/01 | 5 days |
Verify Doppler tracking on a test CW source | 0% | Wed 5/30/01 | Thu 5/31/01 | 2 days |
Implement and verify OTF holographic script | 0% | Fri 2/23/01 | Mon 2/26/01 | 2 days |
Implement and verify GO I.F./ L.O. routing | 0% | Wed 5/2/01 | Wed 5/9/01 | 5 days |
Pulsar observing techniques | 0% | Tue 6/5/01 | Tue 6/12/01 | 5 days |
VLBI observing techniques | 0% | Wed 4/4/01 | Tue 5/1/01 | 20 days |
Verify Aips++ DCR filler | 100% | Thu 1/4/01 | Thu 1/4/01 | 1 day |
Verify Holography Filler | 0% | Tue 4/3/01 | Tue 4/3/01 | 1 day |
Implement actuator offset routine | 0% | Thu 2/1/01 | Wed 2/7/01 | 5 days |
Verify Aips++ Spectrometer fillers | 0% | Tue 4/10/01 | Fri 4/13/01 | 3 days |
Verify Aips++ Spectral Processor filler | 15% | Mon 5/7/01 | Tue 5/8/01 | 2 days |
Measure PF focus Track | 100% | Wed 2/28/01 | Thu 3/1/01 | 2 days |
Determine astronomically PF Xt(El), Y(El) | 80% | Thu 3/8/01 | Mon 7/9/01 | 5 days |
Measure low-freq. Greg. focus track | 100% | Fri 7/27/01 | Mon 7/30/01 | 2 days |
Determine low-freq. Greg. Xt(El), Y(El) | 100% | Wed 8/1/01 | Fri 8/3/01 | 3 days |
Measure high freq. Greg focus track | 0% | Fri 10/26/01 | Mon 10/29/01 | 0.75 days |
Determine high-freq. Greg. Xt(El), Y(El), and Zt(El) | 0% | Tue 10/30/01 | Thu 11/1/01 | 2 days |
Determine Greg. Holography Xt(El). Y(El), and Zt(El) | 0% | Wed 10/24/01 | Fri 10/26/01 | 3 days |
Determine telescope acceleration | 100% | Thu 2/1/01 | Thu 2/1/01 | 1 day |
Determine settling time | 0% | Mon 2/5/01 | Mon 2/5/01 | 1 day |
Observations of stars | 0% | Mon 3/12/01 | Mon 3/26/01 | 10 days |
Measure optical tracking stability | 0% | Thu 3/22/01 | Fri 3/23/01 | 2 days |
Determine optical All-sky coefficients | 0% | Mon 3/26/01 | Mon 4/2/01 | 5 days |
Determine Optical/Radio offsets | 0% | Mon 4/2/01 | Wed 4/4/01 | 2 days |
Measure PF tracking stability | 100% | Tue 7/17/01 | Tue 7/17/01 | 1 day |
Measure PF short-term stability | 100% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Perform PF all-sky map | 100% | Thu 8/2/01 | Fri 8/3/01 | 2 days |
Determine PF all-sky coefficients | 50% | Thu 8/9/01 | Wed 8/15/01 | 5 days |
Verify PF all-sky coefficients | 0% | Thu 8/16/01 | Thu 8/16/01 | 1 day |
Measure Greg. low freq. tracking stability | 100% | Mon 8/20/01 | Mon 8/20/01 | 1 day |
Measure Greg low freq. short-term stability | 100% | Tue 8/21/01 | Tue 8/21/01 | 1 day |
Perform Greg low freq. all-sky map | 100% | Wed 8/22/01 | Wed 8/22/01 | 1 day |
Determine Greg low freq. all-sky coefficients | 100% | Mon 8/27/01 | Fri 8/31/01 | 5 days |
Verify Greg low freq. all-sky coefficients | 100% | Tue 9/4/01 | Tue 9/4/01 | 1 day |
Measure Greg high freq. tracking stability | 0% | Thu 11/1/01 | Fri 11/2/01 | 0.75 days |
Measure Greg high freq. short-term stability | 0% | Mon 11/5/01 | Mon 11/5/01 | 0.75 days |
Perform Greg high freq. all-sky map | 0% | Fri 11/16/01 | Fri 11/16/01 | 0.5 days |
Determine Greg high freq. all-sky coefficients | 0% | Mon 11/19/01 | Thu 11/22/01 | 3 days |
Verify Greg high freq. all-sky coefficients | 0% | Thu 11/22/01 | Fri 11/23/01 | 1 day |
Determine actuator motions from photogrammetry map | 80% | Thu 1/25/01 | Wed 1/31/01 | 5 days |
Measure 12 GHz photogrammetry efficiency pre- measurements | 0% | Thu 9/6/01 | Thu 9/6/01 | 1 day |
Measure 12-GHz photogrammetry efficiency improvement | 0% | Fri 9/21/01 | Fri 9/21/01 | 1 day |
Make Greg. high-resolution map near rigging angle | 0% | Mon 9/24/01 | Fri 9/28/01 | 5 days |
Make Greg. Low-resolution maps at various El | 0% | Tue 10/2/01 | Mon 10/8/01 | 5 days |
Determine actuator motions from holographic map | 0% | Tue 10/16/01 | Mon 10/22/01 | 5 days |
Measure Greg 12 GHz Holog efficiency pre- measurements | 0% | Fri 10/12/01 | Fri 10/12/01 | 0.5 days |
Measure Greg 12-GHz Holog efficiency improvement | 0% | Tue 10/23/01 | Tue 10/23/01 | 0.5 days |
Make PF High-resolution map near rigging angle | 0% | Thu 4/25/02 | Tue 4/30/02 | 3 days |
Make PF Low-resolution maps at various El | 0% | Tue 4/30/02 | Fri 5/3/02 | 3 days |
Measure PF 12 GHz FE efficiency pre-measurements | 0% | Mon 10/15/01 | Mon 10/15/01 | 0.5 days |
Measure PF 12-GHz FE efficiency improvement | 0% | Mon 10/15/01 | Mon 10/15/01 | 0.5 days |
Measure 8-10 GHz efficiencies | 0% | Wed 10/24/01 | Thu 10/25/01 | 1.5 days |
Measure 12-18 GHz efficiencies | 0% | Mon 10/29/01 | Tue 10/30/01 | 1 day |
Measure 18-26 GHz efficiencies | 0% | Fri 11/2/01 | Mon 11/5/01 | 1 day |
Measure 40-52 GHz efficiencies | 0% | Mon 11/19/01 | Wed 11/21/01 | 2 days |
Measure 0.3 - 8 GHz efficiencies | 40% | Tue 11/6/01 | Tue 11/13/01 | 5 days |
Measure scattering pattern - 12 GHz | 0% | Fri 11/23/01 | Mon 11/26/01 | 1 day |
Measure scattering pattern - 26 GHz | 0% | Mon 11/26/01 | Mon 11/26/01 | 0.5 days |
Measure scattering pattern - 50 GHz | 0% | Mon 11/26/01 | Mon 11/26/01 | 0.5 days |
Measure 800 MHz outer sidelobes | 0% | Tue 11/27/01 | Tue 12/4/01 | 5 days |
Measure 1 GHz outer sidelobes | 0% | Mon 12/3/01 | Tue 12/4/01 | 2 days |
Measure 12 GHz outer sidelobes | 0% | Mon 12/10/01 | Tue 12/11/01 | 2 days |
Demonstrate Continuum OTF mapping | 100% | Mon 9/10/01 | Tue 9/11/01 | 1.5 days |
Demonstrate line sensitivity - Strong and weak spectral lines | 0% | Mon 8/20/01 | Tue 8/21/01 | 2 days |
Demonstrate wide-weak spectral line sensitivity | 0% | Mon 9/10/01 | Tue 9/11/01 | 2 days |
Demonstrate spectral line OTF mapping | 0% | Fri 8/31/01 | Thu 9/6/01 | 4 days |
Determine 800 MHz axial focus curve (f,pol) | 0% | Tue 7/3/01 | Thu 7/5/01 | 2 days |
Measure 800 MHz collimation | 0% | Mon 12/17/01 | Tue 12/18/01 | 2 days |
Observe 800 MHz gain calibrators(f,pol) | 0% | Wed 12/19/01 | Thu 12/20/01 | 2 days |
Measure 800 MHz inner beam maps(f,pol) | 56% | Thu 12/27/01 | Mon 12/31/01 | 2 days |
Measure 800 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 12/24/01 | Wed 12/26/01 | 3 days |
Measure 800 MHz beam squint(f) | 88% | Tue 1/1/02 | Thu 1/3/02 | 2 days |
Determine 800 MHz polarization hybrid settings(f) | 0% | Tue 12/25/01 | Wed 12/26/01 | 2 days |
Determine 800 MHz Tcal(f,pol) and Tsys(f,pol) | 50% | Mon 1/7/02 | Mon 1/14/02 | 5 days |
Determine 1-2 GHz axial focus curve (f,pol) | 0% | Mon 12/31/01 | Mon 12/31/01 | 1 day |
Measure 1-2 GHz MHz collimation | 0% | Thu 12/13/01 | Fri 12/14/01 | 1 day |
Observe 1-2 GHz gain calibrators(f,pol) | 0% | Thu 1/3/02 | Mon 1/7/02 | 2 days |
Measure 1-2 GHz inner beam maps(f,pol) | 0% | Mon 1/7/02 | Mon 1/7/02 | 1 day |
Measure 1-2 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/8/02 | Tue 1/8/02 | 1 day |
Measure 1-2 GHz beam squint(f) | 0% | Thu 1/10/02 | Thu 1/10/02 | 1 day |
Determine 1-2 GHz polarization hybrid settings(f) | 0% | Fri 1/11/02 | Fri 1/11/02 | 1 day |
Determine 1-2 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Mon 1/14/02 | Wed 1/16/02 | 3 days |
Determine 1-2 GHz atmospheric Tau(f) | 0% | Mon 1/14/02 | Thu 1/17/02 | 3 days |
Determine 12-18 GHz axial focus curve (f,pol) | 0% | Thu 1/17/02 | Thu 1/17/02 | 1 day |
Measure 12-18 GHz MHz collimation | 0% | Fri 1/18/02 | Fri 1/18/02 | 0.5 days |
Determine 12-18 GHz beam-switching blanking | 0% | Fri 12/7/01 | Fri 12/7/01 | 0.5 days |
Observe 12-18 GHz gain calibrators(f,pol) | 0% | Mon 1/21/02 | Mon 1/21/02 | 1 day |
Measure 12-18 GHz inner beam maps(f,pol) | 0% | Mon 1/21/02 | Mon 1/21/02 | 1 day |
Measure 12-18 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/22/02 | Tue 1/22/02 | 1 day |
Measure 12-18 GHz beam squint(f) | 0% | Wed 1/23/02 | Wed 1/23/02 | 1 day |
Determine 12-18 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Thu 1/24/02 | Thu 1/24/02 | 1 day |
Determine 12-18 GHz atmospheric Tau(f) | 0% | Thu 1/24/02 | Thu 1/24/02 | 1 day |
Determine 40-52 GHz axial focus curve (f,pol) | 0% | Fri 1/25/02 | Fri 1/25/02 | 1 day |
Measure 40-52 GHz MHz collimation | 0% | Mon 1/28/02 | Mon 1/28/02 | 1 day |
Determine 40-52 GHz beam-switching/tertiary blanking | 0% | Mon 1/28/02 | Mon 1/28/02 | 0.5 days |
Observe 40-52 GHz gain calibrators(f,pol) | 0% | Thu 1/31/02 | Thu 1/31/02 | 1 day |
Measure 40-52 GHz inner beam maps(f,pol) | 0% | Mon 2/4/02 | Mon 2/4/02 | 1 day |
Measure 40-52 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 2/5/02 | Tue 2/5/02 | 1 day |
Measure 40-52 GHz beam squint(f) | 0% | Thu 2/7/02 | Thu 2/7/02 | 1 day |
Determine 40-52 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Fri 2/8/02 | Mon 2/11/02 | 2 days |
Determine 40-52 GHz atmospheric Tau(f) | 0% | Fri 2/8/02 | Mon 2/11/02 | 2 days |
Determine 300 MHz axial focus curve (f,pol) | 0% | Wed 2/20/02 | Wed 2/20/02 | 0.5 days |
Measure 300 MHz collimation | 0% | Thu 2/21/02 | Thu 2/21/02 | 0.5 days |
Observe 300 MHz gain calibrators(f,pol) | 0% | Fri 2/22/02 | Fri 2/22/02 | 1 day |
Measure 300 MHz inner beam maps(f,pol) | 0% | Mon 2/25/02 | Mon 2/25/02 | 1 day |
Measure 300 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 2/25/02 | Mon 2/25/02 | 1 day |
Measure 300 MHz beam squint(f) | 0% | Tue 2/26/02 | Tue 2/26/02 | 1 day |
Determine 300 MHz polarization hybrid settings(f) | 0% | Wed 2/27/02 | Wed 2/27/02 | 1 day |
Determine 300 MHz Tcal(f,pol) and Tsys(f,pol) | 0% | Thu 2/28/02 | Thu 2/28/02 | 1 day |
Determine 2-3 GHz axial focus curve (f,pol) | 0% | Thu 2/28/02 | Thu 2/28/02 | 0.5 days |
Measure 2-3 GHz MHz collimation | 0% | Fri 3/1/02 | Fri 3/1/02 | 0.5 days |
Observe 2-3 GHz gain calibrators(f,pol) | 0% | Mon 3/11/02 | Mon 3/11/02 | 1 day |
Measure 2-3 GHz inner beam maps(f,pol) | 20% | Mon 3/11/02 | Mon 3/11/02 | 1 day |
Measure 2-3 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 3/4/02 | Mon 3/4/02 | 1 day |
Measure 2-3 GHz beam squint(f) | 100% | Wed 3/13/02 | Wed 3/13/02 | 1 day |
Determine 2-3 GHz polarization hybrid settings(f) | 0% | Mon 3/4/02 | Mon 3/4/02 | 1 day |
Determine 2-3 GHz Tcal(f,pol) and Tsys(f,pol) | 50% | Fri 3/15/02 | Fri 3/15/02 | 1 day |
Determine 2-3 GHz atmospheric Tau(f) | 50% | Fri 3/15/02 | Fri 3/15/02 | 1 day |
Determine 4-6 GHz axial focus curve (f,pol) | 0% | Tue 3/5/02 | Tue 3/5/02 | 0.5 days |
Measure 4-6 GHz MHz collimation | 0% | Wed 3/6/02 | Wed 3/6/02 | 0.5 days |
Observe 4-6 GHz gain calibrators(f,pol) | 0% | Thu 3/7/02 | Thu 3/7/02 | 1 day |
Measure 4-6 GHz inner beam maps(f,pol) | 0% | Fri 3/8/02 | Fri 3/8/02 | 1 day |
Measure 4-6 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 3/12/02 | Tue 3/12/02 | 1 day |
Measure 4-6 GHz beam squint(f) | 0% | Thu 3/14/02 | Thu 3/14/02 | 1 day |
Determine 4-6 GHz polarization hybrid settings(f) | 0% | Mon 3/18/02 | Mon 3/18/02 | 1 day |
Determine 4-6 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Tue 3/19/02 | Tue 3/19/02 | 1 day |
Determine 4-6 GHz atmospheric Tau(f) | 0% | Tue 3/19/02 | Tue 3/19/02 | 1 day |
Determine 8-10 GHz axial focus curve (f,pol) | 0% | Wed 3/20/02 | Wed 3/20/02 | 0.5 days |
Measure 8-10 GHz MHz collimation | 0% | Thu 3/21/02 | Thu 3/21/02 | 0.5 days |
Observe 8-10 GHz gain calibrators(f,pol) | 0% | Fri 3/22/02 | Fri 3/22/02 | 1 day |
Measure 8-10 GHz inner beam maps(f,pol) | 0% | Mon 3/25/02 | Mon 3/25/02 | 1 day |
Measure 8-10 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 3/25/02 | Mon 3/25/02 | 1 day |
Measure 8-10 GHz beam squint(f) | 0% | Tue 3/26/02 | Tue 3/26/02 | 1 day |
Determine 8-10 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Wed 3/27/02 | Wed 3/27/02 | 1 day |
Determine 8-10 GHz atmospheric Tau(f) | 0% | Wed 3/27/02 | Wed 3/27/02 | 1 day |
Determine 18-26 GHz axial focus curve (f,pol) | 0% | Thu 3/28/02 | Thu 3/28/02 | 1 day |
Measure 18-26 GHz MHz collimation | 0% | Fri 3/29/02 | Fri 3/29/02 | 1 day |
Determine 18-26 GHz beam-switching blanking | 0% | Mon 4/1/02 | Mon 4/1/02 | 1 day |
Observe 18-26 GHz gain calibrators(f,pol) | 0% | Tue 4/2/02 | Tue 4/2/02 | 1 day |
Measure 18-26 GHz inner beam maps(f,pol) | 0% | Thu 4/4/02 | Thu 4/4/02 | 1 day |
Measure 18-26 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Fri 4/5/02 | Fri 4/5/02 | 1 day |
Measure 18-26 GHz beam squint(f) | 0% | Mon 4/8/02 | Mon 4/8/02 | 1 day |
Determine 18-26 GHz Tcal(f,pol) and Tsys(f,pol) | 0% | Tue 4/9/02 | Wed 4/10/02 | 2 days |
Determine 18-26 GHz atmospheric Tau(f) | 0% | Tue 4/9/02 | Wed 4/10/02 | 2 days |
Determine PF2 axial focus curve (f,pol) | 0% | Mon 4/1/02 | Mon 4/1/02 | 0.5 days |
Measure PF2 MHz collimation | 0% | Mon 4/8/02 | Mon 4/8/02 | 0.5 days |
Observe PF2 gain calibrators(f,pol) | 0% | Thu 4/11/02 | Thu 4/11/02 | 1 day |
Measure PF2 inner beam maps(f,pol) | 0% | Fri 4/12/02 | Fri 4/12/02 | 1 day |
Measure PF2 bandpass(f.pol) and baselines(f,pol) | 0% | Mon 4/15/02 | Mon 4/15/02 | 1 day |
Measure PF2 beam squint(f) | 0% | Mon 4/15/02 | Mon 4/15/02 | 1 day |
Determine PF2 polarization hybrid settings(f) | 0% | Tue 4/16/02 | Tue 4/16/02 | 1 day |
Determine PF2 Tcal(f,pol) and Tsys(f,pol) | 0% | Wed 4/17/02 | Wed 4/17/02 | 1 day |
Specify VLBI software interfaces | 100% | Fri 3/16/01 | Wed 3/21/01 | 4 days |
Upgrade VLBA software to current version | 94% | Tue 4/24/01 | Wed 5/2/01 | 4 days |
Design VLBI software communication | 94% | Fri 5/18/01 | Thu 5/24/01 | 4 days |
Code and test VLBI software | 82% | Fri 5/25/01 | Fri 6/1/01 | 4 days |
Specify new S2 communication software | 0% | Tue 4/16/02 | Fri 4/19/02 | 4 days |
Implement S2 system with GBT | 0% | Tue 4/23/02 | Fri 4/26/02 | 4 days |
Upgrade VLBA formatter for 2-recorders | 0% | Thu 4/18/02 | Tue 4/23/02 | 4 days |
Complete optical telescope hardware | 0% | Wed 1/3/01 | Thu 1/4/01 | 2 days |
Complete optical telescope software | 0% | Thu 1/25/01 | Wed 1/31/01 | 5 days |
Measure Hol Greg. pointing collimation | 0% | Mon 9/17/01 | Mon 9/17/01 | 0.5 days |
Determine Hol. Greg. axial focus curve | 0% | Mon 9/17/01 | Mon 9/17/01 | 0.5 days |
Measure Hol. Greg. phase stability on calibrator | 0% | Tue 9/18/01 | Tue 9/18/01 | 0.75 days |
Measure Hol PF pointing collimation | 0% | Mon 4/22/02 | Mon 4/22/02 | 0.5 days |
Determine Hol PF axial focus curve | 0% | Wed 4/24/02 | Wed 4/24/02 | 0.5 days |
Measure Hol PF phase stability on calibrator | 0% | Thu 4/25/02 | Thu 4/25/02 | 0.5 days |
Demonstrate pulsar observing using the Spectrometer | 0% | Wed 10/17/01 | Mon 10/22/01 | 4 days |
Demonstrate pulsar observing using the Spectral Processor | 0% | Mon 2/18/02 | Thu 2/21/02 | 4 days |
Measure Green Bank ties | 0% | Thu 9/13/01 | Fri 9/14/01 | 2 days |
Demonstrate control of GBT for VLBA | 0% | Mon 10/15/01 | Tue 10/16/01 | 2 days |
Demonstrate S2 VLB recording | 0% | Thu 2/14/02 | Fri 2/15/02 | 2 days |
Demonstrate VLB dual-recording capabilities | 0% | Fri 2/15/02 | Mon 2/18/02 | 2 days |
Demonstrate spectral lines with the Spectral Processor in RFI environment | 0% | Wed 9/12/01 | Fri 9/14/01 | 3 days |
Determine position-switched parameters | 0% | Fri 6/22/01 | Fri 6/22/01 | 0.5 days |
Determine frequency-switching parameters | 0% | Mon 6/25/01 | Mon 6/25/01 | 0.5 days |
Determine grid optimum mapping parameters | 0% | Thu 6/28/01 | Fri 6/29/01 | 0.5 days |
Implement and verify line position-switching observing script | 0% | Thu 2/22/01 | Thu 2/22/01 | 1 day |
Implement and verify line frequency-switching observing script | 0% | Mon 4/2/01 | Mon 4/2/01 | 0.5 days |
Determine 800 MHz polarization-switching blanking | 0% | Thu 10/25/01 | Thu 10/25/01 | 0.5 days |
Determine 1-2 GHz polarization-switching blanking | 0% | Mon 12/31/01 | Mon 12/31/01 | 0.5 days |
Determine 2-3 GHz polarization-switching blanking | 0% | Wed 1/30/02 | Wed 1/30/02 | 0.5 days |
Determine 4-6 GHz polarization-switching blanking | 0% | Tue 2/12/02 | Tue 2/12/02 | 0.5 days |
Determine PF2 polarization-switching blanking | 0% | Wed 2/13/02 | Wed 2/13/02 | 0.5 days |
Determine 300 MHz polarization-switching blanking | 0% | Tue 1/29/02 | Tue 1/29/02 | 0.5 days |
Test LO1 manager | 100% | Fri 1/12/01 | Fri 1/12/01 | 1 day |
Check LO1 frequency | 100% | Thu 1/11/01 | Thu 1/11/01 | 1 day |
Test I.F. manager | 100% | Tue 1/16/01 | Wed 1/17/01 | 1 day |
Test I.F. hardware | 100% | Fri 1/12/01 | Mon 1/15/01 | 1 day |
Measure clock & switching-signal delays | 80% | Mon 1/15/01 | Mon 1/15/01 | 1 day |
Implement acceptance of pointing results from Aips++ | 100% | Fri 1/26/01 | Fri 1/26/01 | 1 day |
Implement cross-scan pointing data reduction | 100% | Tue 1/9/01 | Tue 1/9/01 | 1 day |
Implement 1-d focus-curve fitting | 0% | Fri 1/5/01 | Fri 1/5/01 | 1 day |
Implement 2-d focus curve fitting | 0% | Mon 1/8/01 | Tue 1/9/01 | 2 days |
Implement real-time data display and quick reduction | 0% | Thu 1/11/01 | Thu 1/11/01 | 1 day |
Implement all-sky pointing data reduction | 100% | Thu 1/11/01 | Thu 1/11/01 | 1 day |
Implement Tcal and Tsys data reduction | 0% | Mon 1/15/01 | Mon 1/15/01 | 1 day |
Implement atmospheric model fitting | 0% | Tue 1/16/01 | Tue 1/16/01 | 1 day |
Implement continuum OTF mapping data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement continuum polarization data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement beam-switching data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement Amp/phase, Re/I'm, Illum/Offset plotting tools | 0% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement real-time data display | 0% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement 2-d Amp/phase holographic regridding | 0% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement Step 1 instrumental corrections | 0% | Thu 1/25/01 | Thu 1/25/01 | 1 day |
Implement 2-d IFFT routines | 0% | Thu 1/25/01 | Thu 1/25/01 | 0.5 days |
Implement Step 2 instrumental corrections | 0% | Fri 1/26/01 | Fri 1/26/01 | 1 day |
Implement phase-fitting routine | 0% | Thu 2/1/01 | Fri 2/2/01 | 2 days |
Implement real-time data display | 0% | Thu 2/22/01 | Thu 2/22/01 | 1 day |
Implement Doppler-tracking regridding | 0% | Thu 2/22/01 | Thu 2/22/01 | 1 day |
Implement continuum grid mapping data reduction | 0% | Thu 2/22/01 | Thu 2/22/01 | 1 day |
Implement 5-point continuum pointing data reduction | 0% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Implement On-Off data reduction | 0% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Implement multi-purpose continuum plotting tools | 0% | Thu 1/4/01 | Thu 1/4/01 | 1 day |
Implement 1-d continuum OTF regridding | 0% | Thu 1/4/01 | Thu 1/4/01 | 1 day |
Implement 2-d continuum regridding | 0% | Tue 1/16/01 | Tue 1/16/01 | 1 day |
Implement multi-purpose spectral-line plotting tools | 0% | Fri 2/2/01 | Fri 2/2/01 | 1 day |
Implement 5-point spectral-line pointing data reduction | 0% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Implement 3-d spectral-line regridding | 0% | Thu 7/19/01 | Thu 7/19/01 | 1 day |
Implement spectral-line grid mapping data reduction | 0% | Fri 7/20/01 | Fri 7/20/01 | 1 day |
Implement spectral-line OTF mapping data reduction | 0% | Fri 7/20/01 | Fri 7/20/01 | 1 day |
Implement polarization data reduction | 0% | Tue 9/18/01 | Tue 9/18/01 | 1 day |
Measure Prime Focus spillover(El) | 0% | Thu 7/19/01 | Tue 7/24/01 | 4 days |
Measure Gregorian spillover(El) | 50% | Mon 8/27/01 | Thu 8/30/01 | 4 days |
Measure baselines pre spoiler installation | 100% | Thu 5/10/01 | Wed 5/16/01 | 4 days |
Measure baselines post spoiler installation | 0% | Wed 5/16/01 | Mon 5/21/01 | 4 days |
Measure baseline shapes -- Day vs. Night | 25% | Mon 6/4/01 | Thu 6/7/01 | 4 days |
Examine I.F. bandpass for birdies | 0% | Wed 6/13/01 | Tue 6/19/01 | 4 days |
Measure RFI 300 MHz - 5 GHz | 18% | Mon 6/11/01 | Wed 6/20/01 | 8 days |
Demonstration of zero-space flux measurements for VLA data | 0% | Fri 12/14/01 | Thu 12/20/01 | 4 days |
Verify observing catalogs/tables | 100% | Tue 1/2/01 | Tue 1/2/01 | 1 day |
Measure low-freq. Greg. plate scale | 100% | Wed 8/1/01 | Wed 8/1/01 | 1 day |
Measure high-freq. Greg. plate scale | 0% | Mon 8/13/01 | Mon 8/13/01 | 1 day |
Prepare for and move actuators according to photogrammetry results | 0% | Tue 9/18/01 | Wed 9/19/01 | 2 days |
Determine whether or not to use Prime Focus maps for surface setting | 0% | Fri 10/26/01 | Thu 11/1/01 | 4 days |
Servo - Prime Focus | 0% | Thu 7/5/01 | Thu 7/5/01 | 1 day |
Servo - actuator/turret low freq. | 100% | Mon 7/23/01 | Thu 7/26/01 | 2.5 days |
Servo - actuator/turret High Freq. | 0% | Tue 8/7/01 | Thu 8/9/01 | 3 days |
Synthesize focus determinations from all methods | 0% | Mon 8/6/01 | Wed 8/8/01 | 3 days |
Verification of high-freq. Greg. focus coefficients | 0% | Tue 8/14/01 | Fri 8/17/01 | 4 days |
GBT | 15% | Thu 2/1/01 | Sun 5/5/02 | 769 days |
Measure PF focus Track | 100% | Wed 2/28/01 | Mon 3/5/01 | 15 days |
Measure low-freq. Greg. focus track | 100% | Thu 7/26/01 | Tue 7/31/01 | 15 days |
Measure high freq. Greg focus track | 0% | Fri 10/26/01 | Mon 10/29/01 | 9 days |
Determine telescope acceleration | 75% | Thu 2/1/01 | Sat 2/3/01 | 6 days |
Determine settling time | 88% | Sat 2/3/01 | Mon 2/5/01 | 6 days |
Observations of stars | 0% | Mon 3/12/01 | Thu 3/15/01 | 9 days |
Measure optical tracking stability | 0% | Thu 3/22/01 | Sat 3/24/01 | 6 days |
Determine Optical/Radio offsets | 0% | Sun 7/1/01 | Tue 7/3/01 | 6 days |
Measure PF tracking stability | 80% | Tue 7/17/01 | Wed 7/18/01 | 3 days |
Measure PF short-term stability | 80% | Wed 7/18/01 | Thu 7/19/01 | 3 days |
Perform PF all-sky map | 50% | Wed 8/1/01 | Mon 8/6/01 | 15 days |
Verify PF all-sky coefficients | 0% | Wed 8/15/01 | Fri 8/17/01 | 6 days |
Measure Greg. low freq. tracking stability | 100% | Fri 8/17/01 | Sat 8/18/01 | 3 days |
Measure Greg low freq. short-term stability | 100% | Mon 8/20/01 | Tue 8/21/01 | 3 days |
Perform Greg low freq. all-sky map | 100% | Tue 8/21/01 | Sun 8/26/01 | 15 days |
Verify Greg low freq. all-sky coefficients | 100% | Sat 9/1/01 | Sun 9/2/01 | 3 days |
Measure Greg high freq. short-term stability | 0% | Sat 11/3/01 | Sun 11/4/01 | 3 days |
Perform Greg high freq. all-sky map | 0% | Fri 11/16/01 | Mon 11/19/01 | 9 days |
Verify Greg high freq. all-sky coefficients | 0% | Thu 11/22/01 | Fri 11/23/01 | 3 days |
Measure 12 GHz photogrammetry efficiency pre- measurements | 0% | Wed 9/5/01 | Thu 9/6/01 | 3 days |
Measure 12-GHz photogrammetry efficiency improvement | 0% | Thu 9/20/01 | Fri 9/21/01 | 3 days |
Make Greg. high-resolution map near rigging angle | 0% | Fri 9/21/01 | Mon 10/1/01 | 30 days |
Make Greg. Low-resolution maps at various El | 0% | Mon 10/1/01 | Thu 10/11/01 | 30 days |
Measure Greg 12 GHz Holog efficiency pre- measurements | 0% | Thu 10/11/01 | Fri 10/12/01 | 3 days |
Measure Greg 12-GHz Holog efficiency improvement | 0% | Mon 10/22/01 | Tue 10/23/01 | 3 days |
Make PF High-resolution map near rigging angle | 0% | Thu 4/25/02 | Tue 4/30/02 | 15 days |
Make PF Low-resolution maps at various El | 0% | Tue 4/30/02 | Sun 5/5/02 | 15 days |
Measure PF 12 GHz FE efficiency pre-measurements | 0% | Fri 10/12/01 | Sat 10/13/01 | 3 days |
Measure PF 12-GHz FE efficiency improvement | 0% | Mon 10/15/01 | Tue 10/16/01 | 3 days |
Measure 8-10 GHz efficiencies | 0% | Tue 10/23/01 | Wed 10/24/01 | 3 days |
Measure 12-18 GHz efficiencies | 0% | Mon 10/29/01 | Tue 10/30/01 | 3 days |
Measure 18-26 GHz efficiencies | 0% | Fri 11/2/01 | Sat 11/3/01 | 3 days |
Measure 40-52 GHz efficiencies | 0% | Mon 11/19/01 | Thu 11/22/01 | 9 days |
Measure 0.3 - 8 GHz efficiencies | 20% | Tue 11/6/01 | Fri 11/16/01 | 30 days |
Measure scattering pattern - 12 GHz | 0% | Fri 11/23/01 | Sat 11/24/01 | 3 days |
Measure scattering pattern - 26 GHz | 0% | Sat 11/24/01 | Sun 11/25/01 | 3 days |
Measure scattering pattern - 50 GHz | 0% | Mon 11/26/01 | Tue 11/27/01 | 3 days |
Measure 800 MHz outer sidelobes | 0% | Tue 11/27/01 | Sun 12/2/01 | 15 days |
Measure 1 GHz outer sidelobes | 0% | Sun 12/2/01 | Fri 12/7/01 | 15 days |
Measure 12 GHz outer sidelobes | 0% | Sat 12/8/01 | Thu 12/13/01 | 15 days |
Demonstrate Continuum OTF mapping | 100% | Sat 9/8/01 | Mon 9/10/01 | 6 days |
Demonstrate line sensitivity - Strong and weak spectral lines | 0% | Sat 8/18/01 | Mon 8/20/01 | 6 days |
Demonstrate wide-weak spectral line sensitivity | 0% | Mon 9/10/01 | Wed 9/12/01 | 6 days |
Demonstrate spectral line OTF mapping | 0% | Thu 8/30/01 | Sat 9/1/01 | 6 days |
Determine 800 MHz axial focus curve (f,pol) | 0% | Tue 7/3/01 | Wed 7/4/01 | 3 days |
Measure 800 MHz collimation | 0% | Sun 12/16/01 | Mon 12/17/01 | 3 days |
Observe 800 MHz gain calibrators(f,pol) | 0% | Tue 12/18/01 | Fri 12/21/01 | 9 days |
Measure 800 MHz inner beam maps(f,pol) | 52% | Thu 12/27/01 | Sat 12/29/01 | 6 days |
Measure 800 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Fri 12/21/01 | Mon 12/24/01 | 9 days |
Measure 800 MHz beam squint(f) | 80% | Tue 1/1/02 | Thu 1/3/02 | 6 days |
Determine 800 MHz polarization hybrid settings(f) | 0% | Mon 12/24/01 | Wed 12/26/01 | 6 days |
Determine 1-2 GHz axial focus curve (f,pol) | 0% | Sat 12/29/01 | Sun 12/30/01 | 3 days |
Measure 1-2 GHz MHz collimation | 0% | Thu 12/13/01 | Fri 12/14/01 | 3 days |
Observe 1-2 GHz gain calibrators(f,pol) | 0% | Thu 1/3/02 | Sat 1/5/02 | 6 days |
Measure 1-2 GHz inner beam maps(f,pol) | 0% | Sat 1/5/02 | Mon 1/7/02 | 6 days |
Measure 1-2 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/8/02 | Thu 1/10/02 | 6 days |
Measure 1-2 GHz beam squint(f) | 0% | Thu 1/10/02 | Fri 1/11/02 | 3 days |
Determine 1-2 GHz polarization hybrid settings(f) | 0% | Fri 1/11/02 | Sat 1/12/02 | 3 days |
Determine 12-18 GHz axial focus curve (f,pol) | 0% | Thu 1/17/02 | Fri 1/18/02 | 3 days |
Measure 12-18 GHz MHz collimation | 0% | Fri 1/18/02 | Sat 1/19/02 | 3 days |
Determine 12-18 GHz beam-switching blanking | 0% | Fri 12/7/01 | Sat 12/8/01 | 3 days |
Observe 12-18 GHz gain calibrators(f,pol) | 0% | Sat 1/19/02 | Sun 1/20/02 | 3 days |
Measure 12-18 GHz inner beam maps(f,pol) | 0% | Sun 1/20/02 | Mon 1/21/02 | 3 days |
Measure 12-18 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/22/02 | Wed 1/23/02 | 3 days |
Measure 12-18 GHz beam squint(f) | 0% | Wed 1/23/02 | Thu 1/24/02 | 3 days |
Determine 40-52 GHz axial focus curve (f,pol) | 0% | Fri 1/25/02 | Sun 1/27/02 | 6 days |
Measure 40-52 GHz MHz collimation | 0% | Sun 1/27/02 | Mon 1/28/02 | 3 days |
Determine 40-52 GHz beam-switching/tertiary blanking | 0% | Mon 1/28/02 | Tue 1/29/02 | 3 days |
Observe 40-52 GHz gain calibrators(f,pol) | 0% | Thu 1/31/02 | Sun 2/3/02 | 9 days |
Measure 40-52 GHz inner beam maps(f,pol) | 0% | Sun 2/3/02 | Tue 2/5/02 | 6 days |
Measure 40-52 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 2/5/02 | Thu 2/7/02 | 6 days |
Measure 40-52 GHz beam squint(f) | 0% | Thu 2/7/02 | Fri 2/8/02 | 3 days |
Determine 300 MHz axial focus curve (f,pol) | 0% | Wed 2/20/02 | Thu 2/21/02 | 3 days |
Measure 300 MHz collimation | 0% | Thu 2/21/02 | Fri 2/22/02 | 3 days |
Observe 300 MHz gain calibrators(f,pol) | 0% | Fri 2/22/02 | Sat 2/23/02 | 3 days |
Measure 300 MHz inner beam maps(f,pol) | 0% | Sat 2/23/02 | Sun 2/24/02 | 3 days |
Measure 300 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 2/25/02 | Tue 2/26/02 | 3 days |
Measure 300 MHz beam squint(f) | 0% | Tue 2/26/02 | Wed 2/27/02 | 3 days |
Determine 300 MHz polarization hybrid settings(f) | 0% | Wed 2/27/02 | Thu 2/28/02 | 3 days |
Determine 2-3 GHz axial focus curve (f,pol) | 0% | Thu 2/28/02 | Fri 3/1/02 | 3 days |
Measure 2-3 GHz MHz collimation | 0% | Fri 3/1/02 | Sat 3/2/02 | 3 days |
Observe 2-3 GHz gain calibrators(f,pol) | 67% | Sat 3/9/02 | Sun 3/10/02 | 3 days |
Measure 2-3 GHz inner beam maps(f,pol) | 100% | Sun 3/10/02 | Mon 3/11/02 | 3 days |
Measure 2-3 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Sat 3/2/02 | Sun 3/3/02 | 3 days |
Measure 2-3 GHz beam squint(f) | 80% | Wed 3/13/02 | Thu 3/14/02 | 3 days |
Determine 2-3 GHz polarization hybrid settings(f) | 0% | Sun 3/3/02 | Mon 3/4/02 | 3 days |
Determine 4-6 GHz axial focus curve (f,pol) | 0% | Tue 3/5/02 | Wed 3/6/02 | 3 days |
Measure 4-6 GHz MHz collimation | 0% | Wed 3/6/02 | Thu 3/7/02 | 3 days |
Observe 4-6 GHz gain calibrators(f,pol) | 0% | Thu 3/7/02 | Fri 3/8/02 | 3 days |
Measure 4-6 GHz inner beam maps(f,pol) | 0% | Fri 3/8/02 | Sat 3/9/02 | 3 days |
Measure 4-6 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 3/12/02 | Wed 3/13/02 | 3 days |
Measure 4-6 GHz beam squint(f) | 0% | Thu 3/14/02 | Fri 3/15/02 | 3 days |
Determine 4-6 GHz polarization hybrid settings(f) | 0% | Mon 3/18/02 | Tue 3/19/02 | 3 days |
Determine 8-10 GHz axial focus curve (f,pol) | 0% | Wed 3/20/02 | Thu 3/21/02 | 3 days |
Measure 8-10 GHz MHz collimation | 0% | Thu 3/21/02 | Fri 3/22/02 | 3 days |
Observe 8-10 GHz gain calibrators(f,pol) | 0% | Fri 3/22/02 | Sat 3/23/02 | 3 days |
Measure 8-10 GHz inner beam maps(f,pol) | 0% | Sat 3/23/02 | Sun 3/24/02 | 3 days |
Measure 8-10 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 3/25/02 | Tue 3/26/02 | 3 days |
Measure 8-10 GHz beam squint(f) | 0% | Tue 3/26/02 | Wed 3/27/02 | 3 days |
Determine 18-26 GHz axial focus curve (f,pol) | 0% | Thu 3/28/02 | Fri 3/29/02 | 3 days |
Measure 18-26 GHz MHz collimation | 0% | Fri 3/29/02 | Sat 3/30/02 | 3 days |
Determine 18-26 GHz beam-switching blanking | 0% | Sat 3/30/02 | Sun 3/31/02 | 3 days |
Observe 18-26 GHz gain calibrators(f,pol) | 0% | Tue 4/2/02 | Thu 4/4/02 | 6 days |
Measure 18-26 GHz inner beam maps(f,pol) | 0% | Thu 4/4/02 | Fri 4/5/02 | 3 days |
Measure 18-26 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Fri 4/5/02 | Sat 4/6/02 | 3 days |
Measure 18-26 GHz beam squint(f) | 0% | Sat 4/6/02 | Sun 4/7/02 | 3 days |
Determine PF2 axial focus curve (f,pol) | 0% | Mon 4/1/02 | Tue 4/2/02 | 3 days |
Measure PF2 MHz collimation | 0% | Mon 4/8/02 | Tue 4/9/02 | 3 days |
Observe PF2 gain calibrators(f,pol) | 0% | Thu 4/11/02 | Fri 4/12/02 | 3 days |
Measure PF2 inner beam maps(f,pol) | 0% | Fri 4/12/02 | Sat 4/13/02 | 3 days |
Measure PF2 bandpass(f.pol) and baselines(f,pol) | 0% | Sat 4/13/02 | Sun 4/14/02 | 3 days |
Measure PF2 beam squint(f) | 0% | Mon 4/15/02 | Tue 4/16/02 | 3 days |
Determine PF2 polarization hybrid settings(f) | 0% | Tue 4/16/02 | Wed 4/17/02 | 3 days |
Metrology determination of pointing coefficients | 0% | Sat 7/7/01 | Tue 7/17/01 | 15 days |
Metrology determination of Greg. Xt(El,temp), Y(El,temp) | 0% | Thu 2/15/01 | Sun 2/25/01 | 15 days |
Measure Greg high freq. tracking stability | 0% | Thu 11/1/01 | Fri 11/2/01 | 3 days |
Measure Hol Greg. pointing collimation | 0% | Mon 9/17/01 | Mon 9/17/01 | 1.5 days |
Determine Hol. Greg. axial focus curve | 0% | Mon 9/17/01 | Tue 9/18/01 | 1.5 days |
Measure Hol. Greg. phase stability on calibrator | 0% | Tue 9/18/01 | Tue 9/18/01 | 2 days |
Measure Hol PF pointing collimation | 0% | Mon 4/22/02 | Mon 4/22/02 | 1 day |
Determine Hol PF axial focus curve | 0% | Wed 4/24/02 | Wed 4/24/02 | 1.5 days |
Measure Hol PF phase stability on calibrator | 0% | Wed 4/24/02 | Thu 4/25/02 | 2 days |
Demonstrate pulsar observing using the Spectrometer | 0% | Tue 10/16/01 | Thu 10/18/01 | 6 days |
Demonstrate pulsar observing using the Spectral Processor | 0% | Mon 2/18/02 | Wed 2/20/02 | 6 days |
Measure Green Bank ties | 0% | Thu 9/13/01 | Fri 9/14/01 | 3 days |
Demonstrate control of GBT for VLBA | 0% | Sat 10/13/01 | Sun 10/14/01 | 3 days |
Demonstrate S2 VLB recording | 0% | Thu 2/14/02 | Fri 2/15/02 | 3 days |
Demonstrate VLB dual-recording capabilities | 0% | Fri 2/15/02 | Sat 2/16/02 | 3 days |
Demonstrate spectral lines with the Spectral Processor in RFI environment | 0% | Wed 9/12/01 | Thu 9/13/01 | 3 days |
Determine 800 MHz polarization-switching blanking | 0% | Thu 10/25/01 | Fri 10/26/01 | 3 days |
Determine 1-2 GHz polarization-switching blanking | 0% | Mon 12/31/01 | Tue 1/1/02 | 3 days |
Determine 2-3 GHz polarization-switching blanking | 0% | Wed 1/30/02 | Thu 1/31/02 | 3 days |
Determine 4-6 GHz polarization-switching blanking | 0% | Tue 2/12/02 | Wed 2/13/02 | 3 days |
Determine PF2 polarization-switching blanking | 0% | Wed 2/13/02 | Thu 2/14/02 | 3 days |
Determine 300 MHz polarization-switching blanking | 0% | Tue 1/29/02 | Wed 1/30/02 | 3 days |
Measure Prime Focus spillover(El) | 0% | Thu 7/19/01 | Sat 7/21/01 | 6 days |
Measure Gregorian spillover(El) | 100% | Sun 8/26/01 | Tue 8/28/01 | 6 days |
Install spoilers | 0% | Thu 3/8/01 | Fri 3/9/01 | 3 days |
Demonstration of zero-space flux measurements for VLA data | 0% | Fri 12/14/01 | Sun 12/16/01 | 6 days |
Measure low-freq. Greg. plate scale | 100% | Tue 7/31/01 | Wed 8/1/01 | 3 days |
Measure high-freq. Greg. plate scale | 0% | Sun 8/12/01 | Mon 8/13/01 | 3 days |
Servo - Prime Focus | 0% | Wed 7/4/01 | Sat 7/7/01 | 9 days |
Servo - actuator/turret low freq. | 100% | Mon 7/23/01 | Wed 7/25/01 | 6.5 days |
Servo - actuator/turret High Freq. | 0% | Mon 8/6/01 | Thu 8/9/01 | 9 days |
Verification of high-freq. Greg. focus coefficients | 0% | Mon 8/13/01 | Tue 8/14/01 | 3 days |
Mockup | 40% | Tue 1/2/01 | Tue 4/23/02 | 146 days |
Measure baselines pre spoiler installation | 100% | Thu 5/10/01 | Sat 5/12/01 | 6 days |
Measure baselines post spoiler installation | 0% | Wed 5/16/01 | Fri 5/18/01 | 6 days |
Measure baseline shapes -- Day vs. Night | 69% | Sun 6/3/01 | Tue 6/5/01 | 6 days |
Measure RFI 300 MHz - 5 GHz | 72% | Sat 6/9/01 | Wed 6/13/01 | 12 days |
DCR tests | 100% | Wed 1/10/01 | Wed 1/10/01 | 1 day |
Test LO1 manager | 100% | Fri 1/12/01 | Fri 1/12/01 | 1 day |
Check LO1 frequency | 100% | Thu 1/11/01 | Thu 1/11/01 | 1 day |
Test I.F. manager | 100% | Tue 1/16/01 | Tue 1/16/01 | 1 day |
Test I.F. hardware | 100% | Fri 1/12/01 | Sat 1/13/01 | 3 days |
Test Switch Sig Sel | 100% | Fri 1/19/01 | Fri 1/19/01 | 1 day |
Verify M&C manager robustness - Spectrometer | 100% | Fri 3/2/01 | Sat 3/3/01 | 3 days |
Measure Spectrometer bandpass on CW signal - low speed | 90% | Fri 4/20/01 | Mon 4/30/01 | 5 days |
Measure Spectrometer bandpass on CW signal - high speed | 83% | Mon 7/2/01 | Mon 7/9/01 | 3 days |
Measure Spectrometer bandpass on CW signal - 9-level | 98% | Tue 7/3/01 | Thu 7/12/01 | 2 days |
Verify M&C manager robustness - LO1 Counter | 0% | Thu 3/29/01 | Fri 3/30/01 | 2 days |
Verify M&C manager robustness - Holography | 0% | Thu 2/1/01 | Fri 2/2/01 | 2 days |
Measure Holography phase stability on CW signal | 0% | Thu 2/8/01 | Thu 2/8/01 | 1 day |
Code and test VLBI software | 100% | Fri 5/25/01 | Sat 5/26/01 | 2 days |
Implement S2 system with GBT | 0% | Mon 4/22/02 | Tue 4/23/02 | 1 day |
Upgrade VLBA formatter for 2-recorders | 0% | Thu 4/18/02 | Fri 4/19/02 | 2 days |
Measure clock & switching-signal delays | 100% | Sun 1/14/01 | Mon 1/15/01 | 1 day |
Verify 40-52 GHz M&C manager | 0% | Sat 4/7/01 | Sat 4/7/01 | 1 day |
Verify PF2 M&C manager | 0% | Tue 6/26/01 | Tue 6/26/01 | 1 day |
Verify observing catalogs/tables | 100% | Tue 1/2/01 | Tue 1/2/01 | 1 day |
Verify continuum tracking observing script | 100% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement and verify continuum cross-scans observing script | 100% | Wed 1/24/01 | Wed 1/24/01 | 1 day |
Implement and verify PF and Greg. focus tracking script | 100% | Thu 1/18/01 | Thu 1/18/01 | 1 day |
Implement acceptance of pointing results from Aips++ | 100% | Thu 1/25/01 | Fri 1/26/01 | 3 days |
Implement and verify continuum OTF mapping observing script | 100% | Fri 2/9/01 | Fri 2/9/01 | 1 day |
Implement and verify continuum beam-switching observing script | 0% | Wed 2/21/01 | Wed 2/21/01 | 1 day |
Implement and verify continuum polarization-switching observing script | 0% | Tue 2/20/01 | Tue 2/20/01 | 1 day |
Implement and verify continuum on-off observing script | 0% | Fri 6/29/01 | Fri 6/29/01 | 1 day |
Implement and verify continuum 5-point observing script | 0% | Mon 7/2/01 | Mon 7/2/01 | 1 day |
Implement and verify continuum grid mapping observing script | 0% | Fri 7/13/01 | Sat 7/14/01 | 1 day |
Verify line tracking observing script | 100% | Mon 4/30/01 | Mon 4/30/01 | 1 day |
Implement and verify line position-switching observing script | 0% | Thu 2/22/01 | Thu 2/22/01 | 1 day |
Implement and verify line frequency-switching observing script | 0% | Mon 4/2/01 | Mon 4/2/01 | 1 day |
Implement and verify line beam-switching observing script | 0% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Implement and verify line polarization-switching observing script | 0% | Wed 7/18/01 | Thu 7/19/01 | 1 day |
Implement and verify line cross-scan observing script | 0% | Thu 7/19/01 | Thu 7/19/01 | 1 day |
Implement and verify line 5-point observing script | 0% | Thu 7/19/01 | Thu 7/19/01 | 1 day |
Implement and verify line OTF mapping observing script | 0% | Thu 9/20/01 | Thu 9/20/01 | 1 day |
Implement and verify line Grid mapping observing script | 0% | Mon 9/24/01 | Mon 9/24/01 | 1 day |
Verify Doppler tracking on a test CW source | 0% | Tue 5/29/01 | Thu 5/31/01 | 6 days |
Implement and verify OTF holographic script | 0% | Fri 2/23/01 | Sat 2/24/01 | 3 days |
Implement and verify GO I.F./ L.O. routing | 0% | Wed 5/2/01 | Sat 5/5/01 | 9 days |
Pulsar observing techniques | 0% | Tue 6/5/01 | Fri 6/8/01 | 9 days |
VLBI observing techniques | 0% | Wed 4/4/01 | Sat 4/7/01 | 9 days |
Verify Aips++ DCR filler | 100% | Wed 1/3/01 | Thu 1/4/01 | 3 days |
Verify Holography Filler | 0% | Tue 4/3/01 | Wed 4/4/01 | 3 days |
Verify Aips++ Spectrometer fillers | 0% | Tue 4/10/01 | Thu 4/12/01 | 6 days |
Verify Aips++ Spectral Processor filler | 88% | Sat 5/5/01 | Mon 5/7/01 | 6 days |
Examine I.F. bandpass for birdies | 0% | Wed 6/13/01 | Fri 6/15/01 | 6 days |
Monitor and Control | 39% | Wed 1/3/01 | Mon 4/29/02 | 135.25 days |
DCR tests | 100% | Wed 1/10/01 | Wed 1/10/01 | 0.5 days |
Test Switch Sig Sel | 0% | Tue 1/23/01 | Tue 1/23/01 | 1 day |
Implement Spectrometer low-speed 3-level sampler modes | 50% | Wed 1/24/01 | Wed 2/7/01 | 10 days |
Verify M&C manager robustness - Spectrometer | 13% | Wed 3/7/01 | Fri 3/9/01 | 2 days |
Implement Spectrometer high-speed sampler modes | 50% | Thu 2/15/01 | Fri 2/23/01 | 5 days |
Implement Spectrometer 9-level modes | 50% | Fri 2/23/01 | Fri 3/2/01 | 5 days |
Implement Spectrometer pulsar mode | 100% | Fri 7/6/01 | Fri 7/20/01 | 10 days |
Implement LO1 Counter | 0% | Fri 2/9/01 | Fri 2/16/01 | 5 days |
Verify M&C manager robustness - LO1 Counter | 0% | Thu 3/29/01 | Fri 3/30/01 | 1 day |
Verify M&C manager robustness - Holography | 0% | Thu 2/1/01 | Thu 2/1/01 | 1 day |
Implement 40-52 GHz M&C manager | 0% | Fri 2/2/01 | Fri 2/9/01 | 5 days |
Verify 40-52 GHz M&C manager | 0% | Mon 4/9/01 | Tue 4/10/01 | 2 days |
Implement spectral Line - SP | 50% | Thu 3/8/01 | Wed 3/28/01 | 5 days |
Implement pulsar - SP | 0% | Tue 6/19/01 | Tue 6/26/01 | 5 days |
Implement PF2 M&C manager | 0% | Mon 6/4/01 | Mon 6/11/01 | 5 days |
Verify PF2 M&C manager | 0% | Tue 6/26/01 | Tue 6/26/01 | 1 day |
Verify ephemeredes calculations | 63% | Wed 1/3/01 | Mon 1/8/01 | 4 days |
Verify refraction calculations | 63% | Tue 1/9/01 | Fri 1/19/01 | 4 days |
Verify proper use of pointing coefficients | 100% | Mon 1/15/01 | Tue 1/16/01 | 2 days |
Verify continuum tracking observing script | 100% | Tue 1/23/01 | Tue 1/23/01 | 0.5 days |
Implement and verify continuum cross-scans observing script | 100% | Wed 1/24/01 | Wed 1/24/01 | 0.5 days |
Implement and verify PF and Greg. focus tracking script | 100% | Thu 1/18/01 | Thu 1/18/01 | 0.5 days |
Implement and verify continuum OTF mapping observing script | 100% | Fri 2/9/01 | Fri 2/9/01 | 0.5 days |
Implement and verify continuum beam-switching observing script | 0% | Wed 2/21/01 | Wed 2/21/01 | 0.25 days |
Implement and verify continuum polarization-switching observing script | 0% | Tue 2/20/01 | Tue 2/20/01 | 0.25 days |
Implement and verify continuum on-off observing script | 0% | Fri 6/29/01 | Mon 7/2/01 | 0.25 days |
Implement and verify continuum 5-point observing script | 0% | Mon 7/2/01 | Mon 7/2/01 | 0.25 days |
Implement and verify continuum grid mapping observing script | 0% | Fri 7/13/01 | Mon 7/16/01 | 0.25 days |
Verify line tracking observing script | 100% | Mon 4/30/01 | Mon 4/30/01 | 0.5 days |
Implement and verify line beam-switching observing script | 0% | Wed 7/18/01 | Wed 7/18/01 | 0.25 days |
Implement and verify line polarization-switching observing script | 0% | Wed 7/18/01 | Thu 7/19/01 | 0.25 days |
Implement and verify line cross-scan observing script | 0% | Thu 7/19/01 | Fri 7/20/01 | 0.25 days |
Implement and verify line 5-point observing script | 0% | Thu 7/19/01 | Thu 7/19/01 | 0.25 days |
Implement and verify line OTF mapping observing script | 0% | Thu 9/20/01 | Thu 9/20/01 | 0.5 days |
Implement and verify line Grid mapping observing script | 0% | Mon 9/24/01 | Mon 9/24/01 | 0.25 days |
Implement Doppler tracking algorithm | 0% | Tue 5/22/01 | Wed 5/23/01 | 2 days |
Implement and verify OTF holographic script | 0% | Fri 2/23/01 | Fri 2/23/01 | 0.5 days |
Pulsar observing techniques | 0% | Tue 6/5/01 | Thu 6/7/01 | 2 days |
VLBI observing techniques | 0% | Wed 4/4/01 | Thu 4/5/01 | 2 days |
Specify VLBI software interfaces | 100% | Fri 3/16/01 | Thu 3/22/01 | 5 days |
Upgrade VLBA software to current version | 75% | Tue 4/24/01 | Thu 5/3/01 | 5 days |
Design VLBI software communication | 75% | Fri 5/18/01 | Fri 5/25/01 | 5 days |
Code and test VLBI software | 65% | Fri 5/25/01 | Mon 6/4/01 | 5 days |
Specify new S2 communication software | 0% | Tue 4/16/02 | Mon 4/22/02 | 5 days |
Implement S2 system with GBT | 0% | Tue 4/23/02 | Mon 4/29/02 | 5 days |
Upgrade VLBA formatter for 2-recorders | 0% | Thu 4/18/02 | Wed 4/24/02 | 5 days |
Complete optical telescope software | 0% | Thu 1/25/01 | Wed 1/31/01 | 5 days |
Implement and verify line position-switching observing script | 0% | Thu 2/22/01 | Thu 2/22/01 | 0.5 days |
Implement and verify line frequency-switching observing script | 0% | Mon 4/2/01 | Mon 4/2/01 | 0.25 days |
Test LO1 manager | 100% | Fri 1/12/01 | Fri 1/12/01 | 1 day |
Test I.F. manager | 100% | Tue 1/16/01 | Wed 1/17/01 | 1 day |
Verify Doppler tracking on a test CW source | 0% | Wed 5/30/01 | Wed 5/30/01 | 1 day |
Measure Spectrometer bandpass on CW signal - low speed | 50% | Fri 4/20/01 | Tue 5/1/01 | 2 days |
Measure Spectrometer bandpass on CW signal - high speed | 56% | Mon 7/2/01 | Tue 7/10/01 | 1 day |
Measure Spectrometer bandpass on CW signal - 9-level | 6% | Tue 7/3/01 | Fri 7/13/01 | 1 day |
Prepare for and move actuators according to photogrammetry results | 0% | Tue 9/18/01 | Wed 9/19/01 | 2 days |
Engineering | 32% | Wed 1/3/01 | Mon 4/29/02 | 180 days |
Implement Spectrometer low-speed 3-level sampler modes | 50% | Wed 1/24/01 | Wed 2/7/01 | 20 days |
Implement Spectrometer high-speed sampler modes | 50% | Thu 2/15/01 | Fri 2/23/01 | 10 days |
Implement Spectrometer 9-level modes | 50% | Fri 2/23/01 | Fri 3/2/01 | 10 days |
Implement Spectrometer pulsar mode | 100% | Fri 7/6/01 | Fri 7/13/01 | 10 days |
Implement LO1 Counter | 0% | Fri 2/9/01 | Fri 2/16/01 | 5 days |
Measure Holography phase stability on CW signal | 0% | Thu 2/8/01 | Thu 2/8/01 | 0.5 days |
Verify Doppler tracking on a test CW source | 0% | Wed 5/30/01 | Wed 5/30/01 | 1 day |
Determine telescope acceleration | 100% | Thu 2/1/01 | Thu 2/1/01 | 1 day |
Determine settling time | 0% | Mon 2/5/01 | Mon 2/5/01 | 1 day |
Determine 800 MHz axial focus curve (f,pol) | 0% | Tue 7/3/01 | Tue 7/3/01 | 1 day |
Measure 800 MHz collimation | 0% | Mon 12/17/01 | Mon 12/17/01 | 1 day |
Observe 800 MHz gain calibrators(f,pol) | 0% | Wed 12/19/01 | Wed 12/19/01 | 1 day |
Measure 800 MHz inner beam maps(f,pol) | 100% | Thu 12/27/01 | Fri 12/28/01 | 1 day |
Measure 800 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 12/24/01 | Mon 12/24/01 | 1 day |
Measure 800 MHz beam squint(f) | 100% | Tue 1/1/02 | Wed 1/2/02 | 1 day |
Determine 800 MHz polarization hybrid settings(f) | 0% | Tue 12/25/01 | Tue 12/25/01 | 1 day |
Determine 1-2 GHz axial focus curve (f,pol) | 0% | Mon 12/31/01 | Mon 12/31/01 | 1 day |
Measure 1-2 GHz MHz collimation | 0% | Thu 12/13/01 | Fri 12/14/01 | 1 day |
Observe 1-2 GHz gain calibrators(f,pol) | 0% | Thu 1/3/02 | Fri 1/4/02 | 1 day |
Measure 1-2 GHz inner beam maps(f,pol) | 0% | Mon 1/7/02 | Mon 1/7/02 | 1 day |
Measure 1-2 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/8/02 | Tue 1/8/02 | 1 day |
Measure 1-2 GHz beam squint(f) | 0% | Thu 1/10/02 | Thu 1/10/02 | 1 day |
Determine 1-2 GHz polarization hybrid settings(f) | 0% | Fri 1/11/02 | Fri 1/11/02 | 1 day |
Determine 12-18 GHz axial focus curve (f,pol) | 0% | Thu 1/17/02 | Thu 1/17/02 | 1 day |
Measure 12-18 GHz MHz collimation | 0% | Fri 1/18/02 | Fri 1/18/02 | 1 day |
Determine 12-18 GHz beam-switching blanking | 0% | Fri 12/7/01 | Mon 12/10/01 | 1 day |
Observe 12-18 GHz gain calibrators(f,pol) | 0% | Mon 1/21/02 | Mon 1/21/02 | 1 day |
Measure 12-18 GHz inner beam maps(f,pol) | 0% | Mon 1/21/02 | Mon 1/21/02 | 1 day |
Measure 12-18 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/22/02 | Tue 1/22/02 | 1 day |
Measure 12-18 GHz beam squint(f) | 0% | Wed 1/23/02 | Wed 1/23/02 | 1 day |
Determine 40-52 GHz axial focus curve (f,pol) | 0% | Fri 1/25/02 | Fri 1/25/02 | 1 day |
Measure 40-52 GHz MHz collimation | 0% | Mon 1/28/02 | Mon 1/28/02 | 1 day |
Determine 40-52 GHz beam-switching/tertiary blanking | 0% | Mon 1/28/02 | Wed 1/30/02 | 3 days |
Observe 40-52 GHz gain calibrators(f,pol) | 0% | Thu 1/31/02 | Thu 1/31/02 | 1 day |
Measure 40-52 GHz inner beam maps(f,pol) | 0% | Mon 2/4/02 | Mon 2/4/02 | 1 day |
Measure 40-52 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 2/5/02 | Tue 2/5/02 | 1 day |
Measure 40-52 GHz beam squint(f) | 0% | Thu 2/7/02 | Thu 2/7/02 | 1 day |
Determine 300 MHz axial focus curve (f,pol) | 0% | Wed 2/20/02 | Wed 2/20/02 | 0.5 days |
Measure 300 MHz collimation | 0% | Thu 2/21/02 | Thu 2/21/02 | 0.5 days |
Observe 300 MHz gain calibrators(f,pol) | 0% | Fri 2/22/02 | Fri 2/22/02 | 0.5 days |
Measure 300 MHz inner beam maps(f,pol) | 0% | Mon 2/25/02 | Mon 2/25/02 | 0.5 days |
Measure 300 MHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 2/25/02 | Mon 2/25/02 | 0.5 days |
Measure 300 MHz beam squint(f) | 0% | Tue 2/26/02 | Tue 2/26/02 | 0.5 days |
Determine 300 MHz polarization hybrid settings(f) | 0% | Wed 2/27/02 | Wed 2/27/02 | 0.5 days |
Determine 2-3 GHz axial focus curve (f,pol) | 0% | Thu 2/28/02 | Thu 2/28/02 | 0.5 days |
Measure 2-3 GHz MHz collimation | 0% | Fri 3/1/02 | Fri 3/1/02 | 0.5 days |
Observe 2-3 GHz gain calibrators(f,pol) | 0% | Mon 3/11/02 | Mon 3/11/02 | 0.5 days |
Measure 2-3 GHz inner beam maps(f,pol) | 40% | Mon 3/11/02 | Mon 3/11/02 | 0.5 days |
Measure 2-3 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 3/4/02 | Mon 3/4/02 | 0.5 days |
Measure 2-3 GHz beam squint(f) | 100% | Wed 3/13/02 | Wed 3/13/02 | 0.5 days |
Determine 2-3 GHz polarization hybrid settings(f) | 0% | Mon 3/4/02 | Mon 3/4/02 | 0.5 days |
Determine 4-6 GHz axial focus curve (f,pol) | 0% | Tue 3/5/02 | Tue 3/5/02 | 0.5 days |
Measure 4-6 GHz MHz collimation | 0% | Wed 3/6/02 | Wed 3/6/02 | 0.5 days |
Observe 4-6 GHz gain calibrators(f,pol) | 0% | Thu 3/7/02 | Thu 3/7/02 | 0.5 days |
Measure 4-6 GHz inner beam maps(f,pol) | 0% | Fri 3/8/02 | Fri 3/8/02 | 0.5 days |
Measure 4-6 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 3/12/02 | Tue 3/12/02 | 0.5 days |
Measure 4-6 GHz beam squint(f) | 0% | Thu 3/14/02 | Thu 3/14/02 | 0.5 days |
Determine 4-6 GHz polarization hybrid settings(f) | 0% | Mon 3/18/02 | Mon 3/18/02 | 0.5 days |
Determine 8-10 GHz axial focus curve (f,pol) | 0% | Wed 3/20/02 | Wed 3/20/02 | 0.5 days |
Measure 8-10 GHz MHz collimation | 0% | Thu 3/21/02 | Thu 3/21/02 | 0.5 days |
Observe 8-10 GHz gain calibrators(f,pol) | 0% | Fri 3/22/02 | Fri 3/22/02 | 0.5 days |
Measure 8-10 GHz inner beam maps(f,pol) | 0% | Mon 3/25/02 | Mon 3/25/02 | 0.5 days |
Measure 8-10 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Mon 3/25/02 | Mon 3/25/02 | 0.5 days |
Measure 8-10 GHz beam squint(f) | 0% | Tue 3/26/02 | Tue 3/26/02 | 0.5 days |
Determine 18-26 GHz axial focus curve (f,pol) | 0% | Thu 3/28/02 | Thu 3/28/02 | 1 day |
Measure 18-26 GHz MHz collimation | 0% | Fri 3/29/02 | Fri 3/29/02 | 1 day |
Determine 18-26 GHz beam-switching blanking | 0% | Mon 4/1/02 | Mon 4/1/02 | 1 day |
Observe 18-26 GHz gain calibrators(f,pol) | 0% | Tue 4/2/02 | Tue 4/2/02 | 1 day |
Measure 18-26 GHz inner beam maps(f,pol) | 0% | Thu 4/4/02 | Thu 4/4/02 | 1 day |
Measure 18-26 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Fri 4/5/02 | Fri 4/5/02 | 1 day |
Measure 18-26 GHz beam squint(f) | 0% | Mon 4/8/02 | Mon 4/8/02 | 1 day |
Determine PF2 axial focus curve (f,pol) | 0% | Mon 4/1/02 | Mon 4/1/02 | 0.5 days |
Measure PF2 MHz collimation | 0% | Mon 4/8/02 | Mon 4/8/02 | 0.5 days |
Observe PF2 gain calibrators(f,pol) | 0% | Thu 4/11/02 | Thu 4/11/02 | 0.5 days |
Measure PF2 inner beam maps(f,pol) | 0% | Fri 4/12/02 | Fri 4/12/02 | 0.5 days |
Measure PF2 bandpass(f.pol) and baselines(f,pol) | 0% | Mon 4/15/02 | Mon 4/15/02 | 0.5 days |
Measure PF2 beam squint(f) | 0% | Mon 4/15/02 | Mon 4/15/02 | 0.5 days |
Determine PF2 polarization hybrid settings(f) | 0% | Tue 4/16/02 | Tue 4/16/02 | 0.5 days |
Complete PF2 hardware | 0% | Fri 6/1/01 | Fri 6/1/01 | 0 days |
Specify VLBI software interfaces | 100% | Fri 3/16/01 | Thu 3/22/01 | 5 days |
Upgrade VLBA software to current version | 75% | Tue 4/24/01 | Thu 5/3/01 | 5 days |
Design VLBI software communication | 75% | Fri 5/18/01 | Fri 5/25/01 | 5 days |
Code and test VLBI software | 65% | Fri 5/25/01 | Mon 6/4/01 | 5 days |
Specify new S2 communication software | 0% | Tue 4/16/02 | Mon 4/22/02 | 5 days |
Implement S2 system with GBT | 0% | Tue 4/23/02 | Mon 4/29/02 | 5 days |
Upgrade VLBA formatter for 2-recorders | 0% | Thu 4/18/02 | Wed 4/24/02 | 5 days |
Complete optical telescope hardware | 0% | Wed 1/3/01 | Tue 1/9/01 | 5 days |
Determine 800 MHz polarization-switching blanking | 0% | Thu 10/25/01 | Fri 10/26/01 | 1 day |
Determine 1-2 GHz polarization-switching blanking | 0% | Mon 12/31/01 | Tue 1/1/02 | 1 day |
Determine 2-3 GHz polarization-switching blanking | 0% | Wed 1/30/02 | Wed 1/30/02 | 1 day |
Determine 4-6 GHz polarization-switching blanking | 0% | Tue 2/12/02 | Tue 2/12/02 | 1 day |
Determine PF2 polarization-switching blanking | 0% | Wed 2/13/02 | Wed 2/13/02 | 1 day |
Determine 300 MHz polarization-switching blanking | 0% | Tue 1/29/02 | Tue 1/29/02 | 1 day |
Check LO1 frequency | 100% | Thu 1/11/01 | Thu 1/11/01 | 1 day |
Test I.F. hardware | 100% | Fri 1/12/01 | Wed 1/17/01 | 3 days |
Measure clock & switching-signal delays | 80% | Mon 1/15/01 | Mon 1/15/01 | 1 day |
Install spoilers | 0% | Thu 3/8/01 | Thu 3/8/01 | 1 day |
Measure Spectrometer bandpass on CW signal - low speed | 50% | Fri 4/20/01 | Tue 5/1/01 | 2 days |
Measure Spectrometer bandpass on CW signal - high speed | 56% | Mon 7/2/01 | Tue 7/10/01 | 1 day |
Measure Spectrometer bandpass on CW signal - 9-level | 6% | Tue 7/3/01 | Fri 7/13/01 | 1 day |
Prepare for and move actuators according to photogrammetry results | 0% | Tue 9/18/01 | Thu 9/20/01 | 5 days |
Servo - Prime Focus | 0% | Thu 7/5/01 | Thu 7/5/01 | 1 day |
Servo - actuator/turret low freq. | 100% | Mon 7/23/01 | Thu 7/26/01 | 2.5 days |
Servo - actuator/turret High Freq. | 0% | Tue 8/7/01 | Thu 8/9/01 | 3 days |
Aips++ | 15% | Tue 1/2/01 | Mon 9/24/01 | 107 days |
Implement baseline fitting (polynomial, sinusoid) | 100% | Tue 1/2/01 | Tue 1/2/01 | 1 day |
Implement Gaussian fitting (single, multi) | 100% | Tue 1/2/01 | Tue 1/2/01 | 1 day |
Implement template fitting | 80% | Tue 1/2/01 | Tue 1/2/01 | 1 day |
Implement observations data base | 50% | Wed 1/3/01 | Wed 1/3/01 | 1 day |
Implement scripting tools | 50% | Wed 1/3/01 | Wed 1/3/01 | 1 day |
Verify Aips++ DCR filler | 100% | Thu 1/4/01 | Thu 1/4/01 | 1 day |
Implement multi-purpose continuum plotting tools | 0% | Thu 1/4/01 | Wed 1/10/01 | 5 days |
Implement 1-d continuum OTF regridding | 0% | Thu 1/4/01 | Fri 1/5/01 | 2 days |
Implement cross-scan pointing data reduction | 100% | Tue 1/9/01 | Wed 1/10/01 | 2 days |
Implement 1-d focus-curve fitting | 0% | Fri 1/5/01 | Mon 1/8/01 | 2 days |
Implement 2-d focus curve fitting | 0% | Mon 1/8/01 | Fri 1/12/01 | 5 days |
Implement all-sky pointing data reduction | 80% | Thu 1/11/01 | Wed 1/17/01 | 5 days |
Implement real-time data display and quick reduction | 0% | Thu 1/11/01 | Mon 1/15/01 | 3 days |
Implement Tcal and Tsys data reduction | 0% | Mon 1/15/01 | Mon 1/15/01 | 1 day |
Implement atmospheric model fitting | 0% | Tue 1/16/01 | Tue 1/16/01 | 1 day |
Implement 2-d continuum regridding | 0% | Tue 1/16/01 | Wed 1/17/01 | 2 days |
Implement continuum OTF mapping data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement continuum polarization data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement beam-switching data reduction | 0% | Thu 1/18/01 | Fri 1/19/01 | 2 days |
Implement continuum grid mapping data reduction | 0% | Thu 2/22/01 | Fri 2/23/01 | 2 days |
Implement 5-point continuum pointing data reduction | 0% | Wed 7/18/01 | Thu 7/19/01 | 2 days |
Implement On-Off data reduction | 0% | Wed 7/18/01 | Thu 7/19/01 | 2 days |
Verify Holography Filler | 0% | Tue 4/3/01 | Tue 4/3/01 | 1 day |
Implement Amp/phase, Re/I'm, Illum/Offset plotting tools | 0% | Tue 1/23/01 | Thu 1/25/01 | 3 days |
Implement real-time data display | 0% | Tue 1/23/01 | Wed 1/24/01 | 2 days |
Implement 2-d Amp/phase holographic regridding | 0% | Tue 1/23/01 | Wed 1/24/01 | 2 days |
Implement Step 1 instrumental corrections | 0% | Thu 1/25/01 | Mon 1/29/01 | 3 days |
Implement 2-d IFFT routines | 0% | Thu 1/25/01 | Thu 1/25/01 | 1 day |
Implement Step 2 instrumental corrections | 0% | Fri 1/26/01 | Tue 1/30/01 | 3 days |
Implement phase-fitting routine | 0% | Thu 2/1/01 | Tue 2/6/01 | 4 days |
Implement actuator offset routine | 0% | Thu 2/1/01 | Wed 2/7/01 | 5 days |
Verify Aips++ Spectrometer fillers | 0% | Tue 4/10/01 | Thu 4/12/01 | 2 days |
Verify Aips++ Spectral Processor filler | 15% | Mon 5/7/01 | Tue 5/8/01 | 2 days |
Implement multi-purpose spectral-line plotting tools | 0% | Fri 2/2/01 | Fri 2/2/01 | 1 day |
Implement real-time data display | 0% | Thu 2/22/01 | Fri 2/23/01 | 2 days |
Implement 1-d spectral-line regridding | 0% | Wed 1/17/01 | Wed 1/17/01 | 1 day |
Implement Position-switching data reduction | 0% | Mon 1/22/01 | Mon 1/22/01 | 1 day |
Implement Frequency-switching data reduction | 0% | Mon 1/22/01 | Mon 1/22/01 | 1 day |
Implement Beam and Polarization switching data reduction | 0% | Mon 1/22/01 | Mon 1/22/01 | 1 day |
Implement Doppler-tracking regridding | 0% | Thu 2/22/01 | Fri 2/23/01 | 2 days |
Implement 5-point spectral-line pointing data reduction | 0% | Wed 7/18/01 | Wed 7/18/01 | 1 day |
Implement 3-d spectral-line regridding | 0% | Thu 7/19/01 | Mon 7/23/01 | 3 days |
Implement spectral-line grid mapping data reduction | 0% | Fri 7/20/01 | Thu 7/26/01 | 5 days |
Implement spectral-line OTF mapping data reduction | 0% | Fri 7/20/01 | Thu 7/26/01 | 5 days |
Implement polarization data reduction | 0% | Tue 9/18/01 | Mon 9/24/01 | 5 days |
Implement acceptance of pointing results from Aips++ | 100% | Fri 1/26/01 | Thu 2/1/01 | 5 days |
GBT Observe | 29% | Tue 1/2/01 | Mon 9/24/01 | 41 days |
Verify observing catalogs/tables | 100% | Tue 1/2/01 | Tue 1/2/01 | 0.5 days |
Verify ephemeredes calculations | 63% | Wed 1/3/01 | Mon 1/8/01 | 2 days |
Verify refraction calculations | 63% | Tue 1/9/01 | Fri 1/19/01 | 2 days |
Verify proper use of pointing coefficients | 100% | Mon 1/15/01 | Tue 1/16/01 | 1 day |
Verify continuum tracking observing script | 100% | Tue 1/23/01 | Tue 1/23/01 | 0.5 days |
Implement and verify continuum cross-scans observing script | 100% | Wed 1/24/01 | Thu 1/25/01 | 1 day |
Implement and verify PF and Greg. focus tracking script | 25% | Thu 1/18/01 | Tue 2/13/01 | 1 day |
Implement and verify continuum OTF mapping observing script | 74% | Fri 2/9/01 | Fri 2/16/01 | 1 day |
Implement and verify continuum beam-switching observing script | 0% | Wed 2/21/01 | Wed 2/21/01 | 0.5 days |
Implement and verify continuum polarization-switching observing script | 0% | Tue 2/20/01 | Tue 2/20/01 | 0.5 days |
Implement and verify continuum on-off observing script | 0% | Fri 6/29/01 | Mon 7/2/01 | 0.25 days |
Implement and verify continuum 5-point observing script | 0% | Mon 7/2/01 | Mon 7/2/01 | 0.25 days |
Implement and verify continuum grid mapping observing script | 0% | Fri 7/13/01 | Mon 7/16/01 | 0.5 days |
Verify line tracking observing script | 100% | Mon 4/30/01 | Mon 4/30/01 | 0.5 days |
Implement and verify line beam-switching observing script | 0% | Wed 7/18/01 | Wed 7/18/01 | 0.25 days |
Implement and verify line polarization-switching observing script | 0% | Wed 7/18/01 | Thu 7/19/01 | 0.25 days |
Implement and verify line cross-scan observing script | 0% | Thu 7/19/01 | Fri 7/20/01 | 0.25 days |
Implement and verify line 5-point observing script | 0% | Thu 7/19/01 | Thu 7/19/01 | 0.25 days |
Implement and verify line OTF mapping observing script | 0% | Thu 9/20/01 | Fri 9/21/01 | 1 day |
Implement and verify line Grid mapping observing script | 0% | Mon 9/24/01 | Mon 9/24/01 | 0.25 days |
Implement Doppler tracking algorithm | 0% | Tue 5/22/01 | Wed 5/23/01 | 1 day |
Implement and verify OTF holographic script | 0% | Fri 2/23/01 | Mon 2/26/01 | 1 day |
Implement and verify GO I.F./ L.O. routing | 0% | Wed 5/2/01 | Wed 5/16/01 | 5 days |
Pulsar observing techniques | 0% | Tue 6/5/01 | Tue 6/19/01 | 5 days |
VLBI observing techniques | 0% | Wed 4/4/01 | Tue 4/17/01 | 5 days |
Implement acceptance of pointing results from Aips++ | 100% | Fri 1/26/01 | Thu 2/8/01 | 5 days |
Determine cross scans optimum parameters(f) | 0% | Tue 2/13/01 | Wed 2/14/01 | 0.5 days |
Determine focus scans optimum parameters(f) | 0% | Wed 2/14/01 | Thu 2/15/01 | 0.5 days |
Determine 5-point optimum parameters(f) | 0% | Thu 3/29/01 | Fri 3/30/01 | 0.5 days |
Determine OTF optimum mapping parameters | 0% | Thu 6/21/01 | Thu 6/21/01 | 0.5 days |
Determine beam-switching parameters | 0% | Tue 6/26/01 | Wed 6/27/01 | 0.5 days |
Determine polarization switching parameters | 0% | Wed 6/27/01 | Thu 6/28/01 | 0.5 days |
Determine position-switched parameters | 0% | Fri 6/22/01 | Fri 6/22/01 | 0.5 days |
Determine frequency-switching parameters | 0% | Mon 6/25/01 | Mon 6/25/01 | 0.5 days |
Determine grid optimum mapping parameters | 0% | Thu 6/28/01 | Fri 6/29/01 | 0.5 days |
Implement and verify line position-switching observing script | 0% | Thu 2/22/01 | Thu 2/22/01 | 0.5 days |
Implement and verify line frequency-switching observing script | 0% | Mon 4/2/01 | Mon 4/2/01 | 0.25 days |
Wells/Schwab | 9% | Tue 1/2/01 | Thu 9/20/01 | 45 days |
Determine surface(El,temp) and actuators(El,temp) | 0% | Tue 1/2/01 | Mon 1/15/01 | 10 days |
Finite element analysis of Greg. Xt(El,temp), Y(El,temp) | 0% | Thu 2/15/01 | Fri 3/16/01 | 20 days |
Determine actuator motions from photogrammetry map | 80% | Thu 1/25/01 | Wed 1/31/01 | 5 days |
Prepare for and move actuators according to photogrammetry results | 0% | Tue 9/18/01 | Thu 9/20/01 | 3 days |
Synthesize focus determinations from all methods | 0% | Mon 8/6/01 | Wed 8/8/01 | 3 days |
Verification of high-freq. Greg. focus coefficients | 0% | Tue 8/14/01 | Fri 8/17/01 | 4 days |
Metrology | 0% | Thu 2/15/01 | Fri 8/3/01 | 40 days |
Metrology determination of Greg. Xt(El,temp), Y(El,temp) | 0% | Thu 2/15/01 | Fri 3/16/01 | 20 days |
Metrology determination of pointing coefficients | 0% | Mon 7/9/01 | Fri 8/3/01 | 20 days |
CLEO Programming | 26% | Fri 2/2/01 | Fri 8/10/01 | 15 days |
Implement Spectrometer pulsar mode | 50% | Fri 7/6/01 | Fri 8/10/01 | 5 days |
Verify M&C manager robustness - LO1 Counter | 0% | Thu 3/29/01 | Thu 4/5/01 | 1 day |
Code and test VLBI software | 65% | Fri 5/25/01 | Mon 6/4/01 | 1 day |
Implement 40-52 GHz M&C manager | 0% | Fri 2/2/01 | Mon 2/26/01 | 3 days |
Implement PF2 M&C manager | 0% | Mon 6/4/01 | Mon 6/25/01 | 3 days |
Verify M&C manager robustness - Spectrometer | 40% | Fri 3/2/01 | Thu 3/15/01 | 2 days |
High Frequency Weather | 0% | Sun 9/16/01 | Sun 5/5/02 | 249.5 days |
Measure high freq. Greg focus track | 0% | Fri 10/26/01 | Mon 10/29/01 | 9 days |
Perform Greg high freq. all-sky map | 0% | Fri 11/16/01 | Mon 11/19/01 | 9 days |
Verify Greg high freq. all-sky coefficients | 0% | Thu 11/22/01 | Fri 11/23/01 | 3 days |
Make Greg. high-resolution map near rigging angle | 0% | Fri 9/21/01 | Mon 10/1/01 | 30 days |
Make Greg. Low-resolution maps at various El | 0% | Mon 10/1/01 | Thu 10/11/01 | 30 days |
Measure Greg 12 GHz Holog efficiency pre- measurements | 0% | Thu 10/11/01 | Fri 10/12/01 | 3 days |
Measure Greg 12-GHz Holog efficiency improvement | 0% | Mon 10/22/01 | Tue 10/23/01 | 3 days |
Measure 12-18 GHz efficiencies | 0% | Mon 10/29/01 | Tue 10/30/01 | 3 days |
Measure 18-26 GHz efficiencies | 0% | Fri 11/2/01 | Sat 11/3/01 | 3 days |
Measure 40-52 GHz efficiencies | 0% | Mon 11/19/01 | Thu 11/22/01 | 9 days |
Measure scattering pattern - 50 GHz | 0% | Mon 11/26/01 | Tue 11/27/01 | 3 days |
Measure scattering pattern - 26 GHz | 0% | Sat 11/24/01 | Sun 11/25/01 | 3 days |
Measure scattering pattern - 12 GHz | 0% | Fri 11/23/01 | Sat 11/24/01 | 3 days |
Determine 18-26 GHz axial focus curve (f,pol) | 0% | Thu 3/28/02 | Fri 3/29/02 | 3 days |
Measure 18-26 GHz MHz collimation | 0% | Fri 3/29/02 | Sat 3/30/02 | 3 days |
Observe 18-26 GHz gain calibrators(f,pol) | 0% | Tue 4/2/02 | Thu 4/4/02 | 6 days |
Measure 18-26 GHz inner beam maps(f,pol) | 0% | Thu 4/4/02 | Fri 4/5/02 | 3 days |
Measure 18-26 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Fri 4/5/02 | Sat 4/6/02 | 3 days |
Measure 18-26 GHz beam squint(f) | 0% | Sat 4/6/02 | Sun 4/7/02 | 3 days |
Determine 12-18 GHz axial focus curve (f,pol) | 0% | Thu 1/17/02 | Fri 1/18/02 | 3 days |
Measure 12-18 GHz MHz collimation | 0% | Fri 1/18/02 | Sat 1/19/02 | 3 days |
Observe 12-18 GHz gain calibrators(f,pol) | 0% | Sat 1/19/02 | Sun 1/20/02 | 3 days |
Measure 12-18 GHz inner beam maps(f,pol) | 0% | Sun 1/20/02 | Mon 1/21/02 | 3 days |
Measure 12-18 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 1/22/02 | Wed 1/23/02 | 3 days |
Measure 12-18 GHz beam squint(f) | 0% | Wed 1/23/02 | Thu 1/24/02 | 3 days |
Determine 40-52 GHz axial focus curve (f,pol) | 0% | Fri 1/25/02 | Sun 1/27/02 | 6 days |
Measure 40-52 GHz MHz collimation | 0% | Sun 1/27/02 | Mon 1/28/02 | 3 days |
Observe 40-52 GHz gain calibrators(f,pol) | 0% | Thu 1/31/02 | Sun 2/3/02 | 9 days |
Measure 40-52 GHz inner beam maps(f,pol) | 0% | Sun 2/3/02 | Tue 2/5/02 | 6 days |
Measure 40-52 GHz bandpass(f.pol) and baselines(f,pol) | 0% | Tue 2/5/02 | Thu 2/7/02 | 6 days |
Measure 40-52 GHz beam squint(f) | 0% | Thu 2/7/02 | Fri 2/8/02 | 3 days |
Measure PF 12 GHz FE efficiency pre-measurements | 0% | Fri 10/12/01 | Sat 10/13/01 | 3 days |
Measure 12 GHz photogrammetry efficiency pre- measurements | 0% | Sun 9/16/01 | Mon 9/17/01 | 3 days |
Measure 12-GHz photogrammetry efficiency improvement | 0% | Thu 9/20/01 | Fri 9/21/01 | 3 days |
Measure PF 12-GHz FE efficiency improvement | 0% | Mon 10/15/01 | Tue 10/16/01 | 3 days |
Make PF High-resolution map near rigging angle | 0% | Thu 4/25/02 | Tue 4/30/02 | 15 days |
Make PF Low-resolution maps at various El | 0% | Tue 4/30/02 | Sun 5/5/02 | 15 days |
Measure Hol Greg. pointing collimation | 0% | Mon 9/17/01 | Mon 9/17/01 | 1.5 days |
Determine Hol. Greg. axial focus curve | 0% | Mon 9/17/01 | Tue 9/18/01 | 1.5 days |
Measure Hol. Greg. phase stability on calibrator | 0% | Tue 9/18/01 | Tue 9/18/01 | 2 days |
Measure Hol PF pointing collimation | 0% | Mon 4/22/02 | Mon 4/22/02 | 1 day |
Determine Hol PF axial focus curve | 0% | Wed 4/24/02 | Wed 4/24/02 | 1.5 days |
Measure Hol PF phase stability on calibrator | 0% | Wed 4/24/02 | Thu 4/25/02 | 2 days |
Measure 12 GHz outer sidelobes | 0% | Sat 12/8/01 | Thu 12/13/01 | 15 days |