next up previous contents
Next: Introduction Up: The Green Bank Telescope Previous: Contents   Contents


List of Figures

  1. Block diagram of Ranger hardware
  2. Foreground/background system.
  3. ZY Software System Block Diagram.
  4. ZY Main Loop Flowchart.
  5. ZY Servo Find Home Flowchart.
  6. Flowchart for the ZY Servo System settling routine.
  7. ZY mounted on monument, side view.
  8. A/D System Timing Diagram.
  9. ZY Interface: Command Parser & Hash Table
  10. Flowchart for the ZY Scheduler routine.
  11. ZY Initialization Flowchart.
  12. ZY Boot Diskette Archive, as seen from the Windows NT 4.0 Explorer.
  13. Interface between PC/TCP Kernel and network adapter hardware.
  14. ZIY FTP server directory structure, as seen from the Windows NT 4.0 Explorer.
  15. The Status Panel.
  16. The 140' Encoder Display Program.


Ramon E. Creager 2002-03-11