GBT VLBA PROJECT SETUP

Observer's Name: Bartel, Rupen, et al.
Project ID: GB049B
Description: SN1993J: center of the shell and its structural and spectral evolution.
Stations: GBT, VLBA, VLA, Effelsberg, Joddrell, Medicina, Onsala, Noto, Torun, Westerbork
Notes: Correlate at Socorro
Receiver: Rcvr1_2
Receiver Tuning Frequency: 1667
Start Date/Time: Sun Jun 06 2004 1800 UT (2pm edt)
End Date/Time: Mon Jun 07 2004 0600 UT (2am edt)
Number of tapes: 2 (autoallocate)
Tapes change times: 00:11:30 UT
Receiver pol:
filter:
circular
1.60-1.75GHz
LO1 center F0:
phase cal?
1550 MHz
yes : 1MHz
Prelim Notes
This is scheduled on May 25/26, 1900-0700 UT, with the EVN, the VLBA,
and the phased VLA (0400-1600 VLALST), at 256 Mbits/sec (but no more than
two tapes per station).

This will be segment A of the proposal.

It is also scheduled on June 6/7, 1800-0600 UT, with the EVN, the VLBA,
the GBT, and the phased VLA (0330-1600 VLALST), at 256 Mbits/sec (but no
more than two tapes per station).

This will be segment B of the proposal.

Co proposer Michael Rupen should be VLBA technical contact person
for this proposal.

As part of the Global Session, observe files are due in both Bologna and
Socorro by May 6.