GBT VLBA PROJECT SETUP: BS113

Observer's Name: I.Stairs
Project ID: BS113
Receiver: Rcvr1_2
Center Frequency: 1425, 1685 MHz
Start Date/Time: Tue May 14 2002 08:00 UT (04:00 am EDT)
Ending Date/Time: Tue May 14 2002 11:32 UT (07:32 am EDT)
Number of tapes: 1
Tapes change times: -----
Glish setup script: BS113_setup_L.g
Receiver pol:
gain, phase, atten:
filter:
circular
x=+3, y= -6, phase=83.5
1.10-1.80 GHz : also use notch filter
LO1 center F0:
phase cal?
1550 MHz
no

Signal Routing
Rcvr IFRack IF Filter Fiber Cnv.Rack Cnv.LO2 DAR channel
Rcvr1_2:XLA S1 2840-3160 1 A,CM1 12750 C
Rcvr1_2:YRB S3 2840-3160 3 A,CM5 12750 A

Checklist:
Project:
Download and setup files and scripts.
Check clocks.
Clean drives and mount tapes.
Start experiment.
Dismount and prepare tapes for shipping.
Ship tapes and enter them in TRACK.
Copy log files to jansky.
Send e-mail to Socorro.