GBT VLBA PROJECT SETUP

Observer's Name: Y. Philstrom et al.
Project ID: BP107
Receiver: Rcvr1_2
Stations : GBT, VLBA
Description HI absorbing gas in OQ208
Receiver Tuning Frequency: 1319 MHz
Start Date/Time: Sep 06,2003 16:00UT
End Date/Time: Sep 07, 2003 04:00UT
Number of tapes: 2
Tapes change times: 03:10 UT (autoallocate)
Receiver pol:
filter:
circular
1.1-1.45 NoNotch filter!
LO1 center F0:
phase cal?
1300 MHz
no

Contact:
I propose to schedule this on September 6/7, 1600-0400 UT, with the GBT, at 128 Mbits/sec. We would like to have an observe file by August 22.

Signal Routing
Rcvr IFRack IF Filter Fiber Cnv.Rack Cnv.LO2 DAR channel
Rcvr1_2:L1 S1 2960-3040 1 A,CM1 12750 C
Rcvr1_2:R1 S3 2960-3040 3 A,CM5 12750 A