GBT08A-004 Band: PF1/450 MHz source: 0414+0534 Scheduled on 09 Sep 09, 04:00 - 08:00 ET 13 Sep 09, 00:30 - 08:00 ET 17 Sep 09, 03:45 - 07:00 ET (a) Run RCO script (standard pointing using 3C123) and verify that pointing parameters and profiles look reasonable (b) Run the program source configuration script 4b0h-cfg. This will configure the spectrometer for 4 windows and 2 polarizations and carry out an on-off balance. When finished verify that the spectrometer counts look reasonable (c) Run the program source script J0414+0534 which will perform 6 five minute on-offs - total time of script is about 1 hour. (d) Run CAL script which will perform one 5 minute on-off measurement with NO configuration or balancing. (e) Repeat sequence (c) through (d) until time is finished If there are spectrometer problems or or issues which necessitate re-starting the spectrometer or any hardware/software which will impact the configuration or balance of the system, start with step (b). If all goes well the script sequences would be RCO 4boh-cfg J0414+0534 CAL J0414+0534 CAL J0414+0534 CAL J0414+0534 CAL ... repeat to fill observing time ...