GBT SCIENTIFIC WORKING GROUP April 12, 1994 at 4 PM EDT AGENDA 1) GBT stuff on the 140 foot (Norrod) 2) Receiver Priorities for 1995 and onward (Norrod) 3) Update on construction (Lockman) 4) Spectrometer News (Escoffier) 5) Feed Rotator etc. * * * * * * * * Status of GBT Receivers PRIME FOCUS 0.29-1.23 GHz Under construction. GREGORIAN FOCUS 1.15-1.73 Under construction. Single feed. 3.95-5.85 Under construction. Single feed. 8.0-10.0 Done Single feed. 12.0-15.4 Done. Dual feed. 18-22 Done. Dual feed. 22-26 Done. Dual feed. PROPOSED RECEIVERS TOP RANKED 1.73-2.60 Timely experiments in 1996. Relatively inexpensive and easy to build. 40-52 Array of 7+ elements, most single polarization, tertiary reflector for rapid beam switching. Complicated and expensive. Personnel not yet available, though possible in late 1994. LOWER RANKED 25-75 MHz Prime focus. Easy and cheap to build. Dual S/X For VLBI. Optics require development. 12-15 GHz Array for continuum mapping. EXPERIMENTAL <10K L band Very low Tsys for HI. Requires substantial development. 20K K band Seeks very low Tsys for this popular band. Requires a substantial development effort. 3 mm. To be of use it requires the telescope to exceed design specs on surface accuracy and pointing.