Technical Reviews - GBT 3mm Receiver Project
Conceptual Design Review
Held May 29, 2001.
- Preparatory Memo
- Summary
- Wootten Note on Frequency Range
Held October 2, 2001.
Critical Design Review
To be scheduled.
Lab Test Review
To be scheduled.
This page last modified 10/18/2004. Maintained by: rnorrod@nrao.edu
Home