Technical Reviews - GBT 3mm Receiver Project


Conceptual Design Review

Held May 29, 2001.


Preliminary Design Review

Held October 2, 2001.


Critical Design Review

To be scheduled.


Lab Test Review

To be scheduled.


This page last modified 10/18/2004. Maintained by: rnorrod@nrao.edu

Home