The New Dynamic Scheduling System for the GBT
GBT DSS Released for summer tests!
Newlestter article
The GBT DSS team on the morning of the release. The team, clockwise from top left is: Larry Morgan, Jules Harnett, Amy Shelton, Dana Balser, Jim Braatz, Mike McCarty, Carl Bignell, Mark Clark, Paul Marganian, and Karen O'Neil. Team "helpers" Willie and Max O'Ganian are at the bottom left (Max is hidden). Team members missing from the photo are Jim Condon and Eric Sessoms.
Introduction Overview Benefits of the DSS More Information Questions
The GBT will be scheduled using the prototype Dynamic Scheduling System (DSS) for the 08B trimester (June 1 - Sept 30, 2008). After September 30, the telescope will revert back to its previous scheduling system (see http://wiki.gb.nrao.edu/bin/view/Observing/GbtSchedularProcs) until the full release of the DSS (currently planned for summer, 2009).
The goal of the DSS is to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and the data quality of observations is not adversely affected. The DSS works by breaking each project into one or more sessions. Project sessions have associated observing criteria such as RA, Dec, frequency, receiver. Observers also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses that data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the predicted weather does not match the actual weather, a backup project, chosen from the database, will be run instead.
Details of the DSS can be found at http://www.gb.nrao.edu/dss. Access to the system is available through a link on that page or directly at https://dss.gb.nrao.edu. The websites contains an introduction to the DSS, which includes an overview of the information needed by the DSS to schedule a project, as well as a tutorial on using the system and a section of frequently asked questions. There are also links to the DSS help desk and to a chat facility for online help.
To increase the likelihood of observing early in the trimester, we encourage observers to prepare observing scripts and to work with the DSS database in advance of the start of the trimester. As soon as observers are satisfied with their preparations they should indicate in the database that they want their projects 'enabled'. Projects which are not 'enabled' by the start of the trimester will simply be considered for scheduling whenever the proper preparations are completed. Note that observers can update information in the DSS database at any time before or during the trimester as personal and observing plans change. We especially encourage observers to keep their blackout dates and contact information up-to-date as the trimester progresses.
GBT staff will, as always, be available to help observers both in working with the observing information in the DSS database and also with understanding the new dynamic scheduling scheme. It should be noted that the DSS alters only the scheduling process for the GBT and will not affect the observing interface (e.g. Astrid) in any way. Any questions you may have regarding the GBT dynamic scheduling system, the GBT scheduling this summer, or your project's database should be sent to the DSS team (helpdesk-dss at nrao.edu). If you have questions regarding the GBT hardware or otherwise achieving the science needs of your project, please address them, as always, to your project's assigned friend.
Finally, please note that everyone who observes during the 8B trimester will be encouraged to provide feedback on their experiences. This feedback will allow the DSS team to ensure that the DSS will be readily usable by all GBT observers when the system is fully deployed.
The GBT spans a larger range of frequencies than other comparable centimeter/millimeter single-dish telescopes, and is located in a continental, mid-latitude region where weather is dominated by water vapor and small-scale effects. As a result, the observing efficiency of the GBT can be enhanced significantly by dynamically scheduling observations best matched to weather conditions.
To date, the GBT has employed a simple form of dynamic scheduling in which two projects, one high-frequency and one low-frequency, are scheduled together in two sessions (spaced typically by two days). The high-frequency observer is allowed to choose which of the sessions he or she would like to use. The other session is used by the low-frequency observer. This scheme often results in high-frequency observers receiving little or no time if they wait for truly high-frequency weather, which compromises the ability to discharge these projects, and could delay completion of low-frequency projects if high-frequency observers choose substandard conditions to execute their observations. Additionally, not all high-frequency programs require the same weather. E.g. weather conditions which may be ideal for K-band observations are not necessarily the best for Q-band, and vice-versa. The new Dynamic Scheduling System (DSS) allows observers to optimally match their desired weather conditions to their observations, resulting in considerably increased observing efficiency.
An improved scheme, and the accompanying software and hardware, for dynamically scheduling science on the GBT is required to make the most efficient use of telescope time, which is in high demand. This must be delivered however in a way which minimizes the burden on the GBT observer. These are the two primary goals of the GBT Dynamic Scheduling System (DSS). A successful implementation of the DSS should increase the average observing efficiency at high frequencies with the GBT (by approximately 50%) while ensuring that the flexibility and ease of use of the GBT is fully retained, and the data quality of observations is not adversely affected.
Overview
A successful implementation of dynamic scheduling will increase the average observing efficiency at high frequencies
with the GBT (by approximately 50%) while ensuring that none of the flexibility and ease of use of the
GBT is harmed and the data quality of observations is not adversely affected.
One of the primary benefits of single dish radio observations is the ease with which observers can make on-the-fly decisions regarding their data and observing process. Additionally, the GBT was built with the flexibility to allow users to bring in their own hardware for observations, an idea which has proven to be highly successful. As these instruments are not typically fully integrated into the GBT monitor and control software system, users of these instruments need to be able to interact with their hardware in real time during observations.
The flexibility of the GBT (e.g. the ability to observe from 0.3 - 90 GHz, observer-created observing routines and telescope patterns and a large number of observatory supported front and back-ends) means that GBT data quality assurance is a formidable issue. To date the issue has been dealt with by requiring project investigators to acquire the data for their project in real time and so be responsible for the data quality of their own projects. Any move away from this scheme, e.g. to a queue-based system wherein Green Bank staff run an observing project, would require both GB staff having a detailed understanding of the scientific requirements of every project and a data reduction pipeline for all queue based projects (to allow the staff to asses the data quality). While the NRAO E2E division is working toward creating a data reduction pipeline for the most common observing modes on all NRAO telescopes, that pipeline is only getting started. Additionally, Green Bank simply does not have sufficient staff to allow for scientific data quality checks of all, or even most, GBT experiments.
As a result, the GBT DSS team is implementing a dynamic scheduling system which is markedly different from the standard queue-based system that other telescopes use. At the start of a trimester, observers will be asked to indicate when they will be available to observe. Within the time periods observers themselves specify, they will be notified if their project is likely to be run. Notification will be well in advance of the observations. Then every 24 hours the DSS will create a schedule for the GBT from the pool of available projects. At this point, a minimum of 24 hours before their observations start, the relevant observers will be notified that their observations have been placed on the schedule. The weather will then be monitored by the DSS in real time. If at any point the weather has deteriorated such that the scheduled project cannot be run, a back-up project (which has been pre-approved and can be run in the available weather) will be run in its place. The back-up project may be run with the GBT support staff running the experiment and monitoring the data quality, or it may be run by a project investigator who has agreed to be notified at the last minute, depending on the wishes of the project investigators and the complexity of the project.
One of the components of the GBT DSS, which will both improve the ease of use of the GBT and make the DSS plans feasible, is the implementation of an observer's availability calendar for each project. With this calendar each observer can note the times he or she cannot be available for observing, blocking anything from an hour to months. The exciting part of this system is that any observer can update it at any time as that information will be immediately and automatically fed into the scheduling software. As a result, it will be extremely easy for observers to make sure that GBT observing does not conflict with any other commitment. It should be noted also that the DSS team is looking into the best method for notifying observers of the probability of their projects being scheduled over a ~1 week period, which will aid observers in knowing when they may be scheduled on the telescope.
There are, of course, many other details to the GBT DSS, such as the ability to schedule monitoring and fixed time observations, a ranking scheme for scheduling the projects, etc. All these details are publicly available through the Project Main Page and the DSS Memo series.
Benefits of the GBT DSS
In addition to improving the observing efficiencies for high-frequency observers, the DSS will allow for more flexible use of the GBT. This will benefit both high and low-frequency observers in many ways, including:
- Observations affected by transient RFI can be halted and seamlessly rescheduled;
- System faults (both in hardware and software) will be easier to work around and fixes will be easier to schedule, making the running of the GBT smoother and more efficient;
- Any "make-up time" needed for a project will be easily rescheduled, allowing the observations to be completed within the requested trimester;
- Rapid Response Proposals will be scheduled without disrupting another observer's scheduled time;
- Observers will be able to state when they wish to travel to Green Bank for observations, rather than being told by the telescope scheduler when to arrive;
- Observers will be able to change their availability for observing even as the trimester progresses rather than only a few months before a trimester begins
- Observers will be able to block out many small amounts of available time (e.g. when teaching classes) rather than needing to adjust their personal schedule to a pre-set telescope schedule;
- Observers will have the ability to observe a small part of their allotted time and then request a few days (or more) to analyze the data before using more telescope time;
- Complicated monitoring programs will be easily handled by the DSS;
- The GBT scheduling process will be transparent, allowing users to discern the likelihood of attaining telescope time as the trimester progresses.
- Project Main Page
- Introdution to the DSS
- Tutorial on using the DSS beta release
- Glossary of DSS terms
- Frequently asked questions
- DSS Memo Series
- Buy DSS shirts!
Questions
about the new GBT DSS can be sent to the help desk (helpdesk-dss at nrao.edu)