Interference Protection Group meeting 06/25/02 Proposed Agenda Minutes of 5/21/02 meeting Interference to pulsar observing around 600 MHz (Jeff) 3.6-meter antenna installation (Rick) GBT RFI 'harmful levels' below 100 MHz Feed arm servo filtering status (Rich, Randy) Laser shielding and filtering status (Randy) Shielded room repair status (Jeff) RFI considerations for new Education Center Status of current action items (Jeff) ------------------------------------------------------- Interference to pulsar observing around 1400 MHz Site-wide interference suppression policy status (John) Deer stand RFI survey (Rick) GBT RFI 'harmful levels' document and measurement procedures Power line noise monitoring Measurements of PC/Workstation in a shielded box Interference at 1612.17 MHz Initiatives to assemble requirements and specifications in the following areas: Long term strategy for response to RFI reports from observers Quick response to observing problems Follow-up and feedback to observers Requirements for detection instrumentation Telescope operator training and involvement Measurements and monitoring concerned with NRQZ RFI environment data base compilations (Rick) Procedures for acquiring and screening new purchases for RFI compliance Techniques for designing or modifying new equipment for RFI compliance Design reviews Training Standards Case study/illustration Next meeting time/date (7/16/02)