Interference Protection Group meeting 1/18/00 Proposed Agenda Minutes of 12/21/99 meeting Interference reports Review of action items: 1. Some year-end purchases (Rick) 2. Site radio system (Chuck) 3. Microwave oven in shielded test box (John) 4. RFI considerations for new Education Center (Frank) 5. Monitor station developments (Rick) 6. Shielded room entrances (John, Rick) 7. A turntable for the anechoic chamber (Rick) 8. Switching transient noise on GBT 9. Transmissions from the 140-ft for the SOHO mission 10. Progress on suppressing RFI from equipment that has been measured in the anechoic chamber 11. Emissions from the new diesels on site 12. GBT RFI 'harmful levels' document and measurement procedures (Rick) 13. Measurement of OVLBI transmission field strengths at the GBT. 14. Disabled persons transport on site for tours 15. RFI survey plan for GBT commissioning (Rick) 16. Lab RFI suppression efforts (Rick) 17. Interference at 1612.17 MHz 18. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date