Interference Protection Group meeting 8/10/99 Agenda Minutes of 7/27/99 meeting Interference call-out reports Review of action items: 1. Blanking and sig/ref switching for anechoic chamber (Tim) 2. Site radio system (Chuck) 3. Microwave oven in shielded test box (John) 4. Shielded room entrances (John, Rick) 5. Monitor station developments (Rick) 6. Progress on suppressing RFI from equipment that has been measured in the anechoic chamber 7. Emissions from the new diesels on site 8. GBT RFI 'harmful levels' document and measurement procedures (Rick) 9. Measurement of OVLBI transmission field strengths at the GBT. 10. RFI considerations for new Education Center (Frank) 11. RFI survey plan for GBT commissioning (Rick) 12. Lab RFI suppression efforts (Rick) 13. Interference at 1612.17 MHz 14. RFI monitor for Education Center 15. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date