Interference Protection Group meeting 2/9/99 Agenda Minutes of 1/26/99 meeting Interference call-out reports Review of action items: 1. Tourists' digital cameras 2. Interference at 1612.17 MHz 3. GBT subreflector actuator heaters (Tim, Rich) 4. Site radio system (Chuck) 5. Microwave oven in shielded test box (Chuck) 6. Technical seminar on RFI suppression requirements and techniques (Rick) 7. Monitor station and anechoic chamber developments (Rick, Rich) 8. RFI considerations for new Education Center (Frank) 9. Lab RFI suppression efforts (Rick) 10. Cal and sig/ref switching system system for anechoic chamber (Rich, Chuck, Rick) 11. GBT RFI 'harmful levels' document (Rick) 12. Use of spectral processor with anechoic chamber (Rick) 13. FCC Class B requirements and test procedures (Rick, Chuck) Requirement for a turret for anechoic chamber Summary of new action items Next meeting time/date