Interference Protection Group meeting 5/13/97 Agenda Minutes of last meeting Progress on action items: 1. Interference call-out reports (Mark, Rick, Rich) 2. Status of auditorium broadcast system (Chuck) 3. RFI tests of workstation, PC and other equipment (Rich, Chuck) 4. RFI testing of the GBT feed arm servo (Rich, Mark) 5. Indoor range cable entry (Tim, Chuck) 6. GBT RFI limits document (Rick) 7. Cart and indoor range electronics design (Rich) Indoor range needs below 100 MHz 8. Monitoring equipment storage and lab areas (Mark, Tim) 9. Monitor station design. (Rick, Mark) Other items, reports or issues Tektronics EMI course Synthesizer sharing with SETI Interference from off-site PC's (e.g., Green Bank school) Interference from interferometer control building (future tour center?) Summary of new action items Next meeting time/date