Refer to the latest maintenance responsibility listings for individuals assigned to this system.
GBT IF/LO System; dated 5 Sep 96
The following individuals contributed assistance to this document: GBT Operators, M. Stennes, G. Watts, J. Ford.
Prepared by: Donna L. Stricklin, GBT Operations
Last Updated: 30 MAY, 2001