GBT Daily Summary for Mon Apr 22, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


        Day Shift: 0700-1900    Operator: Donna Stricklin
                
                o  0730-1630    Maintenance/Outfitting:
                        Windbreaker and skirts installed on azimuth track
                        Inspected quad detector placement
                        GBT HVAC system checkout
                        Routine maintenance accomplished on upper elevator
                        
                o  1630-1750    Commissioning (Maddelena, 9 GHz)
                o  1750-1900    Science (GBT02A-016)

	Night Shift: 1900-0700  Operator: Dave Rose

                o  1900-0530    Science (GBT02A-016)
                o  1530-0700    Commissioning (Fisher, 1.42 GHz)
J. Lawrence 04/23/02