GBT Daily Summary for Wed Apr 17, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Greg Monk
o 0700-0745 Observation 2A052 (Stairs, 820 MHz)
o 0745-1630 Maintenance/Outfitting:
Work done on concrete pads for laser mounts.
Edge drip strip installed on Az track covers.
Subreflector box installation on X-axis.
Surveying laser monuments.
Walk thru completed.
o 1630-1900 Commissioning (Maddalena, 22.2 GHz)
Night Shift: 1900-0700 Operator: Kevin Gum
o 1900-2400 Commissioning (Maddalena, 22.2 GHz)
o 0000-0700 Observation 2A021 (Balser, 2400 MHz)
J. Lawrence 04/18/2002