Day Shift: 0700-1900 Operator: Greg Monk
o 0700-0745 Observation 2A039 (Camillo, 1.47 GHz)
o 0745-1630 Maintenance/Outfitting:
Check/marking for future positioning of concrete pads for track laser testing.
Skirt installation for Az track
Installation of track for drip edge
Electronics check out in servo room
Measurement done on feed arm quadrant detector laser mount
Walk through completed
o 1630-1900 Commissioning (Maddalena, 22.2 GHz)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-2230 Commissioning (Maddalena, 22.2 GHz)
o 2230-0330 Observation 1A017A (Stairs, 1470 MHz)
o 0330-0530 Observation 2A052 (Stairs, 1470 MHz)
o 0530-0630 Observation 2A052 (Stairs, 2200 MHz)
o 0630-0700 Observation 2A052 (Stairs, 820 MHz)
J. Lawrence 04/18/2002