GBT Daily Summary for Tue Apr 9, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Greg Monk
o 0730-1730 Maintenance/Outfitting:
Flex plate measurement test conducted
HVAC lines bled
Active surface troublshooting
Track covered with plastic
o 1730-1900 Commissioning (Ghigo, 22.235 GHz)
Night Shift: 1900-0700 Operator: Kevin Gum
o 1900-0700 Commissioning (Ghigo, 22.235 GHz)
- stopped at 0000 due to problem see
test tone out of converter rack
J. Lawrence 04/10/02