GBT Daily Summary for Mon Apr 8, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


        Day Shift: 0700-1900    Operator: Greg Monk
                
                o  0730-1730    Maintenance/Outfitting:
                        Azimuth track fins installed
                        C-band receiver prep work
                        Quadrant detector measurements taken
                        Optical fiber driver module #7 installed
                        Receiver room temp problem investigated
                        Checked out water in surface actuators
                        
                o  1730-1900    Commissioning (Balser, 22.235 GHz)
        
	Night Shift: 1900-0700  Operator: Kevin Gum

                o  1900-0700    Commissioning (Balser, 22.235 GHz)
J. Lawrence 04/09/02