GBT Daily Summary for Thu Apr 4, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Dave Rose
o 0730-1630 Maintenance/Outfitting:
Az track/Az truck #4 inspection and tests
Laser metrology testing
o 1630-1705 Commissioning (Langston, 18.7 GHz)
o 1705-1900 Commissioning (Balser, 22.235 GHz)
Night Shift: 1900-0700 Operator: Barry Sharp
o 1900-0700 Commissioning (Balser, 22.235 GHz)- Note:
spectrometer hung at 2045 and could not be restarted
J. Lawrence 04/05/02