Day Shift: 0700-1900 Operator: Barry Sharp
o 0800-1630 Maintenance/Outfitting:
Continued track measurements
Laser Metrology testing
Rerouted rx room cables from K-band to IF rack
Inspected for cabling to install lockout in rx room
o 1630-1900 Commissioning-(Langston, 330 MHz)
Night Shift: 1900-0700 Operator: Eric Knapp
o 1900-2220 Commissioning-(Langston, 330 MHz)
o 2220-0700 Commissioning-(Langston, 22,235 MHz)
J. Lawrence 03/27/02