Day Shift: 0700-1900 Operator: Greg Monk
o 0700-1640 Maintenance/Outfitting:
Track inspection/measurements
Laser metrology testing
Eye bolts installed on track covers
IF rack cabling in receiver room
checkout power supply in actuator room
o 1640-1900 L-band testing (Norrod)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-2000 Testing (Norrod)
o 2000-2320 Commissioning (Langston, 600 MHz)
o 2320-0110 Commissioning (Maddelena, Holography, 12 GHz)
o 0110-0235 Commissioning (Maddelena, 22.233 GHz)
o 0235-0700 Commissioning (Fisher, Galaxy Survey)