GBT Daily Summary for Tue Mar 12, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Dave Rose
o 0800-1630 Maintenance/Outfitting:
Pulled IF rack noise source for upgrade
Reinstalled holography receiver components
Az track covers installed and checked
o 1630-1900 Commissioning (Prestage, 2.2 GHz)
Night Shift: 1900-0700 Operator: Barry Sharp
o 1900-0000 Commissioning (Prestage, 2.2 GHz)
o 0000-0700 Commissioning (Roshi, 600Hz)
J. Lawrence 03/13/02