GBT Daily Summary for Tue Mar 5, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Kevin Gum
o 0800-1600 Maintenance/Outfitting:
Inspected Azimuth track
Feed change- 800 MHz installed
Laser software checkout
K-band receiver checkout
o 1600-1700 Software Testing (Clark, Prestage)
o 1700-1900 Commissioning (Balser, Holography)
Night Shift: 1900-0700 Operator: Greg Monk
o 1900-2345 Commissioning (Balser, Holography)
o 2345-0145 Commissioning (Ghigo, 1665 MHz)
o 0145-0700 Science (GBT02A-039) (NOTE: JL power
conditioner failure at 0410, equipment
returned to ops at 0540)
J. Lawrence 03/07/02