GBT Daily Summary for Wed Feb 27, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift: 0700-1900    Operator: Eric Knapp

o  0800-1600    Maintenance/Outfitting:
                Laser metrology system tested
                Repaired frozen limit switch on upper elevator
                Worked on K-band receiver
                
o  1600-1900    Testing (Roshi, 300 MHz)

Night Shift: 1900-0700  Operator: Kevin Gum

o  1900-0700    Testing (Roshi, 300 MHz)
J. Lawrence 02/28/02