Day Shift: 0700-1900 Operator: Eric Knapp o 0800-1600 Maintenance/Outfitting: Laser metrology system tested Repaired frozen limit switch on upper elevator Worked on K-band receiver o 1600-1900 Testing (Roshi, 300 MHz) Night Shift: 1900-0700 Operator: Kevin Gum o 1900-0700 Testing (Roshi, 300 MHz)J. Lawrence 02/28/02