GBT Daily Summary for Tue Feb 26, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift: 0700-1900    Operator: Kevin Gum

o  0800-1600    Maintenance/Outfitting:
                Worked on elevation stow pin
                Azimuth track cover modifications continued
                Installation work on DB37 filter box
                
o  1600-1900    AIPS++ testing (Maddelena, 1420 MHz)

Night Shift: 1900-0700  Operator: Greg Monk

o  1900-0000    AIPS++ testing (Maddelena, 1420 MHz)

o  0000-0700    Testing (Roshi, 2000 MHz)
J. Lawrence 02/27/02