GBT Daily Summary for Tue Feb 26, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Kevin Gum
o 0800-1600 Maintenance/Outfitting:
Worked on elevation stow pin
Azimuth track cover modifications continued
Installation work on DB37 filter box
o 1600-1900 AIPS++ testing (Maddelena, 1420 MHz)
Night Shift: 1900-0700 Operator: Greg Monk
o 1900-0000 AIPS++ testing (Maddelena, 1420 MHz)
o 0000-0700 Testing (Roshi, 2000 MHz)
J. Lawrence 02/27/02