GBT Daily Summary for Mon Feb 25, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Kevin Gum
o 0800-1600 Maintenance/Outfitting:
Installed feed defroster
Removed wind sensor
Inspected surface panels
Worked on Az track covers
Modified IF for holography
Changed prime focus feed to 340 MHz
Changed optical module to IF channel 3
o 1600-1900 Testing (Stairs, BCPM)
Night Shift: 1900-0700 Operator: Greg Monk
o 1900-2000 Testing (Stairs, BCPM)
o 2000-0700 Testing (Roshi, 330 MHz)
J. Lawrence 02/27/02