GBT Daily Summary for Tue Feb 19, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Kevin Gum
o 0730-1630 Maintenance/Outfitting:
Checkout of servo room HVAC
Installed gasket on actuator room door
Installed L Band receiver/feed
Installed new optical driver
Installed new panel for 100 MHz distribution box
Reset surface panel
o 1630-1900 Commissioning (Langston, 800 MHz)
Night Shift: 1900-0700 Operator: Greg Monk
o 1900-2230 Commissioning (Langston, 800 MHz)
o 2230-0200 Commissioning (Langston, 1420 MHz)
o 2200-0700 Commissioning (Fisher, Galaxy Survey)
J. Lawrence 02/20/02