Day Shift: 0700-1900 Operator: Eric Knapp
o 0730-1630 Maintenance/Outfitting:
Holography receiver checked out
Installed feedroom conduit
Continued warehouse renovations (canteen)
Prep work for installation of quad detector
Azimuth track inspections
o 1630-1900 Commissioning (Jewell, 12178 MHz)
Night Shift: 1900-0700 Operator: Kevin Gum
o 1900-0700 Commissioning (Jewell, 12178 MHz)
--no data taken from 0000-0700 due to problems with pointing
J. Lawrence 02/13/02