GBT Daily Summary for Wed Feb 6, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Donna Stricklin
o 0800-1600 Maintenance/Outfitting:
Installed new lock on GBT Operator Lockout
Replaced prime focus IF cable
Checked IRIG signal in servo room
Installed skirts on azimuth track covers
Locate position for quad sector laser
Perfomed routine maintenance on generators
o 1600-1900 Commissioning (Maddelena, Langston, 12.178 GHz)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-0700 Commissioning (Maddelena, Langston, 12.178 GHz)
J. Lawrence 02/08/02