Day Shift: 0700-1900 Operator: Eric Knapp/Donna Stricklin
o 0800-1600 Maintenance/Outfitting:
Work on shielded rack in receiver room
Install prime focus cables
Installed first aid kit
Checked X-band refrigerator
Training accomplished on track checkout
Tachometer signals from servo room to control room
Checked for locations for track potentiometers
o 1600-1900 Commissioning (Balser, 14000 MHz)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-0700 Commissioning (Balser, 14000 MHz)