GBT Daily Summary for Fri Feb 1, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  



Day Shift 0700-1900     Operator:  Eric Knapp


        o  0700-1050    Science (Stairs, GBT01A-075)
 
        o  1050-1630    Scheduled Maintenance
                           Surveyed structure with paint contractor
                           Azimuth track inspection
                           Rewrapped azimuth track with plastic

        o  1630-1900    Commissioning (Balser, 9000 MHz)

Night Shift: 1900-0700  Operator: Greg Monk

        o  1900-0700    Commissioning (Balser, 9000 MHz)
J. Lawrence 02/05/02