GBT Daily Summary for Wed Jan 23, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Greg Monk
o 0800-1700 Maintenance/Outfitting:
Card cage reinstalled, x-band receiver checked out
Stow pin switch rewired
Quadrant detector area surveyed
Auto Stow testing
Servo testing/monitoring for voltage/current
o 1700-1900 Testing (Langston, 01A-058, 800 MHz)
Night Shift: 1900-0700 Operator: Kevin Gum
o 1900-0700 Testing (Langston, 01A-058, 800 MHz)
J. Lawrence 01/24/02