GBT Daily Summary for Tue Jan 22, 2002

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift: 0700-1900    Operator: Greg Monk
                
o  0800-1630    Maintenance/Outfitting:
                Checked voltages on power feeds
                X-band refrigerator replaced and pump turned on
                Upper elevator switch repaired
                Az track visual inspection and noise check
                Az track protective wrap installed
                

o  1630-1900    Software Testing (Prestage)

Night Shift: 1900-0700  Operator: Kevin Gum     
J. Lawrence 01/23/02