GBT Daily Summary for Tue Jan 15, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Greg Monk
o 0800-1630 Maintenance/Outfitting:
Oil pump installed for L-band
RFI measured at receiver room
Azimuth tachometer changed out
Motor controllers 1 and 2 back in
Azimuth track strain gauge checked for track movement
Azimuth motor current test performed
o 1630-1700 Not Scheduled
o 1700-1900 Commissioning (Ghigo, 600 MHz)
Night Shift: 1900-0700 Operator: Kevin Gum
o 1900-0700 Commissioning (Ghigo, 600 MHz)
J. Lawrence 01/16/02